Button to Fermilab Home Page
Button to NuMI-MINOS Home Page Menu Bar Nu Oscillation Image
Button to Project General Documentation Page Button to NuMI at Work Page Button to MINOS at Work Page Button to Contacts and Email Page Button to NuMI Notes Document Repository Page Button to Fermilab at Work Page
Header Base image
NuMI Technical Design Handbook
Procedure for Revisions
In MS Word form In PDF form

Name Format Date
Chapter 1 - Introduction(MS Word) (PDF) 12/3/02
Chapter 2 - Overview of the NuMI Beamline(MS Word)(PDF) 12/3/02
Chapter 3 - Design Parameters(MS Word)(PDF) 12/3/02
Chapter 4.1 - Primary Beam Systems(MS Word)(PDF) 12/5/02
Chapter 4.1 - Primary Beam Systems - Appendices A (Beamline Sensitivity Effects) & B (Aperture Considerations) (MS Word) (PDF) 12/6/02
Chapter 4.1 - Primary Beam Systems - Appendix C (Beamsheet) (MS Word) (PDF) (TXT) 1/22/04
Chapter 4.1 - Primary Beam Systems - Appendix D (Beamsheet Log) (MS Word) (PDF) 1/22/04
Chapter 4.1 - Primary Beam Systems - Appendix E (Annotated Unofficial Beamsheet--Reader's Guide to the Beamsheet ) (MS Word) (PDF) 10/31/03
Chapter 4.2.1 - Neutrino Beam Devices - Overview(MS Word)(PDF) 12/3/02
Chapter 4.2.2 - Baffle(MS Word)(PDF) 12/3/02
Chapter 4.2.3 - Target(MS Word)(PDF) 12/3/02
Chapter 4.2.4 - Horns(MS Word)(PDF) 2/14/03
Chapter 4.2.5 - Magnetic Field Monitoring(MS Word)(PDF) 12/3/02
Chapter 4.2.6 - Cross Hair Alignment(MS Word)(PDF) 5/23/03
Chapter 4.2.7 - Remote Clamp(MS Word)(PDF) 12/3/02
Chapter 4.2.8 - Carrier(MS Word)(PDF) 12/3/02
Chapter 4.2.9 - Modules(MS Word)(PDF) 5/22/03
Chapter 4.2.10 - Work Cell(MS Word)(PDF) 5/25/03
Chapter 4.2.11 - Target Hall Crane Camera(MS Word)(PDF) 12/3/02
Chapter 4.2.12 - Target Pile Shielding(MS Word)(PDF) 12/5/02
Chapter 4.2.13 - Target Pile Cooling(MS Word)(PDF) 12/5/02
Chapter 4.2.14 - Target Pile Installation Equipment(MS Word)(PDF) 12/5/02
Chapter 4.2.15 - Target Hall Instrumentation(MS Word)(PDF) 12/5/02
Name Format Date
Chapter 4.3 - Power Supply Systems(MS Word)(PDF)5/13/03
Chapter 4.3 - Power Supply Requirements(MS Excel)(PDF)5/13/03
Chapter 4.4 - Decay Region & Hadron Absorber(MS Word)(PDF)8/12/05
Chapter 4.5 - Neutrino Beam Monitoring(MS Word)(PDF)12/3/02
Chapter 4.6 - Survey, Alignment & Geodesy(MS Word)(PDF)12/3/02
Chapter 4.7 - Water, Vacuum & Gas Systems(MS Word)(PDF)12/3/02
Chapter 4.8 - Controls, Interlocks & Cable Installation (MS Word)(PDF)3/18/04
Chapter 4.8 - Controls, Interlocks & Cable Installation - Appendix A

(Worksheets in this Workbook are the Tables in Chapter 4.8)

(MS Excel) 3/18/04
Chapter 5 - Radiation Safety(MS Word)(PDF)12/3/02

Send suggestions or comments to - the Pagemaster

Page last updated Tuesday, July 20, 2004

Security, Privacy,Legal

Fermi National
	    Accelerator Laboratory