Review of the NuMI Transmission Line
(4/23/03)
Previous Reviews
WBS 1.1.3 Horn Transmission Line
- Feb. 26, 2002
Somewhat related:
WBS 1.1.3 Flex Joint
- July 10, 2001
Somewhat related:
WBS 1.1.3 Horn Power Supply
- Aug 13, 2001
Reference Materials
Response Feb. 26, 2002 Review Comments
- Apr. 18, 2003
Transmission Line through the Block & Beyond Design/Status
NuMI Technical Design Handbook
- See Chapter 4.3.5
Stripline Leakage Current (due to beam ionization) Analysis
- microsoft word.
Presentations
Overview, Specifications, Concerns
(20') - N. Grossman
Testing at MI8 & Beam Ionization Calculations
(25') - J. Hylen
Cooling Calculations (10') - A. Stefanik - (handed out at review.)
Transmission Line through the Block & Beyond Design/Status
(45') - B. Boettinger (pictures handed out at review)
Response to Previous Review Comments
Response Feb. 26, 2002 Review Comments
- Apr. 18, 2003
Review Comments
B. Markel
- doc
J. Hylen
- txt
D. Pushka
- txt
K. Anderson - comments from Kris were discussed in a meeting on 4/28/03. His comments are also already reflected in the comments of others posted here.
K. Bourkland
- doc
K. Bourkland electrical heating calcs check
-doc
D. Tinsley
- txt
F. Nezrick
- txt
Closure document