CY 2002 Internal Review Reference Materials and Talks

Reviews of NuMI Beam Design - Year 2001


  • WBS 1.1 Director's Review of NuMI Beam April 4, 2001

  • WBS 1.1.4 Hadron Absorber June 12, 2001.

  • WBS 1.1.1 & 1.1.3 Specs for Magnet Power Supply - June 28, 2001

  • WBS 1.1.4 Decay Pipe - July 9, 2001

  • WBS 1.1.3 Flex Joint - July 10, 2001

  • WBS 1.1.3 Magnet Power Supply - July 11, 2001

  • WBS 1.1.7 Infrastructure - July 12 & 20, 2001

  • WBS 1.1.1 Specs & Design for Primary Beamline - July 13 & 18, 2001

  • WBS 1.1.1 Specs & Design for Primary Beamline Instrumentation - July 26 & Aug 14, 2001

  • WBS 1.1.2 Shielding of Target Hall area - July 27, 2001

  • WBS 1.1.2 Hot Horn Handling - Aug 3, 2001

  • WBS 1.1.2 Horn System - Aug 10, 2001

  • WBS 1.1.3 Horn Power Supply - Aug 13, 2001

  • WBS 1.1.1 Beam Extraction Permit System - Aug 17, 2001

  • WBS 1.1.2 Neutrino Device Instrumentation - Oct 18, 2001

  • WBS 1.1.7 RAW system - Oct 24, 2001

  • WBS 1.1.4 Absorber - Nov 20, 2001

  • WBS 1.1.5 Neutrino Beam Monitoring - Dec 10, 2001

  • WBS 1.1.1 Primary Beam Optics Design - Dec 11, 2001




  • Reviews of NuMI Beam Design - Year 2000


  • Review of the NuMI Muon Monitor System December 2, 2000

  • Review of the NuMI Low Energy Target October 17, 2000

  • Review of the NuMI Beam Hadron Hose Proposal October 5, 2000

  • Review of the NuMI Beam Target Pile September 19, 2000

  • Review of the NuMI Primary Beam January 25, 2000