Button to Fermilab Home Page
Button to NuMI-MINOS Home Page Menu Bar Nu Oscillation Image
Button to Project General Documentation Page Button to NuMI at Work Page Button to MINOS at Work Page Button to Contacts and Email Page Button to NuMI Notes Document Repository Page Button to Fermilab at Work Page
Header Base image

NuMI Procedures

Horn Pulsed Power Supply

  • Production Power Supply
    • NuMI Horn Testing with Production Power Supply at MI8 Procedure (MS Word) (PDF)
    • LOTO Procedure for NuMI Horn Operational Power Supply (MS Word) (PDF)
    • NuMI Horn Production Power Supply Safety Analysis (MS Word) (PDF)

  • Prototype Power Supply
    • NuMI Horn Testing at MI8 Procedure (MS Word) (PDF)
    • LOTO Procedure for NuMI Prototype Horn Test Power Supply (MS Word) (PDF)
    • NuMI Horn Test Power Supply Safety Analysis Report (MS Word) (PDF)

Underground Access

  • NuMI Underground Entry during Installation Activities (MS Word) (PDF) - 3/30/04

Extraction Kicker PS and Kicker Magnets

Carrier Tunnel Magnet Installation

Decay End Cap Installation (NuMI Note 1000)


Send suggestions or comments to - The Pagemaster

Page last updated Wednesday, November 03, 2004

Security, Privacy,Legal

Fermi National
	    Accelerator Laboratory