Year 2000
=========

  WBS 1.1.1 Extraction & transport        Jan 25        **DONE**
  WBS 1.1.5 Monitoring system             Feb  4        **DONE**
  WBS 1.1.2 Target chase                  Sep 10        **DONE**
  WBS 1.1.2 Target                        Oct 19        **DONE**
  WBS 1.1.5 Muon monitor                  Dec  1        **DONE**

Year 2001
=========

  WBS 1.1.2 Target #2                     Apr  3        **DONE**
  WBS 1.1.5 Hadron monitor                May 17        **DONE**
  WBS 1.1.4 Absorber                      Jun 12        **DONE**
  WBS 1.1.1 Optics & power supply spec    Jun 28        **DONE**
  WBS 1.1.4 Decay pipe                    Jul  9        **DONE**
  WBS 1.1.3 Horn Transmission Line        Jul 10 (Tue)  **DONE**
  WBS 1.1.3 Magnet power supply           Jul 11 (Wed)  **DONE**
  WBS 1.1.7 Infrastructure - part I       Jul 12 (Thu)  **DONE**
  WBS 1.1.1 Design Parameters             Jul 13 (Fri)  **DONE**
  WBS 1.1.1 System design                 Jul 18 (Wed)  **DONE**
  WBS 1.1.7 Infrastructure - part II      Jul 20 (Fri)  **DONE**
  Workshop - Beam Simulation, part I      Jul 24 (Tue)  **DONE** 
  WBS 1.1.1 Instrumentation spec          Jul 26 (Thu)  **DONE**
  WBS 1.1.2 Shielding of target hall      Jul 27 (Fri)  **DONE**
  WBS 1.1.2 Hot Horn Handling             Aug  3 (Fri)  **DONE**
  WBS 1.1.2 Horn                          Aug 10 (Fri)  **DONE**
  WBS 1.1.3 Horn power supply             Aug 13 (Mon)  **DONE**
  WBS 1.1.1 Instrumentation               Aug 14 (Tue)  **DONE**
  WBS 1.1.1 Extraction Permit System      Aug 17 (Fri)  **DONE**
  Workshop - Beam Simulation, part II     Aug 24 (Fri)  **DONE**
  Workshop - Installation schedule (US)   Sep  5 (Wed)  **DONE**
  Workshop - Installation schedule (US)   Sep 27 (Thu)  **DONE**
  WBS 1.1.2 Instrumentation               Oct 18 (Thu)  **DONE**
  WBS 1.1   Commissioning plan            Oct 19 (Fri)  **DONE**
  WBS 1.1.7 RAW system                    Oct 24 (Wed)  **DONE**
  Workshop - Installation schedule (DS)   Oct 25 (Thu)  **DONE**
  WBS 1.1.4 Absorber #2                   Nov 20 (Tue)  **DONE** 
  WBS 1.1   Accident Conditions           Nov 28 (Wed)  **DONE**
  WBS 1.1.5 Beam monitoring #2            Dec 10 (Mon)  **DONE**
  WBS 1.1.1 Beam optics #2                Dec 11 (Tue)  **DONE**
  WBS 1.1.2 Target & Target baffle #1     Dec 18 (Tue)  **DONE**


Year 2002
=========

  Workshop - Commissioning plan           Jan  3 (Thu)  **DONE**
  WBS 1.1.1 Kicker Beam Tube              Feb  1 (Fri)  **DONE**
  Workshop - Beam Optics                  Feb 25 (Mon)  **DONE**
  WBS 1.1   Installation Schedule         Feb 20-21     **DONE**
  WBS 1.1.3 Horn Transmission Line,       Feb 26 (Tue)  **DONE**
  WBS 1.1.2 Remote Clamp,Trans Line Block Feb 26 (Tue)  **DONE**
  WBS 1.1.2 Hot Horn Handling #2          Feb 27 (Wed)  **DONE**
  Workshop - Beam Monitoring Design       Mar  1 (Fri)  **DONE**
  WBS 1.1   Infrastructure #2             Mar  6 (Wed)  **DONE**
  WBS 1.1   Installation Schedule         Mar 20-21     **DONE**
  WBS 1.1.1 Beam Optics Director's Review Apr  2 (Tue)  **DONE**
  WBS 1.0   Director's Review             Apr 23-24     **DONE** 
  WBS 1.1.1 Kicker cooling system         Jun 14 (Fri)  **DONE**
  WBS 1.1.1 BPM electronics               Jun 25 (Tue)  **DONE**
  WBS 1.1.1 & 1.1.3 Kicker System  #2     Jul  1 (Mon)  **DONE**          
  WBS 1.1   Radiation Safety Review       Jul 17 (Wed)  **DONE** 
  WBS 1.1.5 Beam Monitoring System        Jul 24 (Wed)  **DONE** 
  WBS 1.1.2 Baffle,Baffle &Target Carrier Aug 1 (Thu)   **DONE**  
  WBS 1.1.1 Beam Optics Design (MI issues)Sep (ongoing series of meetings)
                                                        **DONE**
  WBS 1.1   Risk Assessment Workshop #2   Oct 8 (Tue)   **DONE** 
  WBS 1.1.1 Primary Beam Instr. & MW      Oct 14 (Mon)  **DONE**
  WBS 1.1.7 US LCW Water Systems Valid.   Oct           **DONE**
  WBS 1.1.1 Primary Beam Sensitivities    Nov 1         **DONE**
  WBS 1.1   Commissioning Plan Workshop   Nov 5         **DONE**
  WBS 1.1.2 Instr. & Monitoring Tgt Hall  Nov 18        **DONE**
  WBS 1.1.7 Horn RAW System Review        Nov           **DONE**
  Director's Review (Installation focus)  Dec 4         **DONE**
  DOE Review of the NuMI Project          Dec 9-11      **DONE**

  
Year 2003
=========
 
  WBS 1.1.1 Main Injector & NuMI BPM Review March 4     **DONE**
  WBS 1.1.5 Beam Monitoring (#3)          March         **DONE**
  WBS 1.1.7 Horn RAW System Review        March         **DONE**
  WBS 1.1   Commissioning plan (final)    March         **DONE**
  WBS 1.1   L3 Manager Review of Controls March         **DONE**
  WBS 1.1   Accident Conditions Workshop  March         **DONE**
  WBS 1.1.3,1.1.1 Conv.Magnets & PS(final) March/April  **DONE**
  Director's Review of NuMI Installation Plan April 8-9 **DONE**
  WBS 1.1   Accident Conditions Workshop  Mar/Apr       **DONE**
  WBS 1.1.3 Horn Transmission Line        Apr 23        **DONE**
  WBS 1.1   Final Review of Controls      Apr           **DONE**
  DOE Review of the NuMI Project          May 28-30     **DONE**
  Target Hall Air System                  July 30       **DONE**
  US Installation                         Aug 13        **DONE**
  DS Installation                         Sep 18        **DONE**  
  Primary Beam Instrumentation            Oct 24        **DONE**

Back to Top of Technical Components Reviews Page



Send suggestions or comments to - the Pagemaster

Page last updated Tuesday, October 14, 2003

Security, Privacy,Legal

Fermi National
	    Accelerator Laboratory