Back to Top of Technical
Components Reviews Page
Year 2000
=========
WBS 1.1.1 Extraction & transport Jan 25 **DONE**
WBS 1.1.5 Monitoring system Feb 4 **DONE**
WBS 1.1.2 Target chase Sep 10 **DONE**
WBS 1.1.2 Target Oct 19 **DONE**
WBS 1.1.5 Muon monitor Dec 1 **DONE**
Year 2001
=========
WBS 1.1.2 Target #2 Apr 3 **DONE**
WBS 1.1.5 Hadron monitor May 17 **DONE**
WBS 1.1.4 Absorber Jun 12 **DONE**
WBS 1.1.1 Optics & power supply spec Jun 28 **DONE**
WBS 1.1.4 Decay pipe Jul 9 **DONE**
WBS 1.1.3 Horn Transmission Line Jul 10 (Tue) **DONE**
WBS 1.1.3 Magnet power supply Jul 11 (Wed) **DONE**
WBS 1.1.7 Infrastructure - part I Jul 12 (Thu) **DONE**
WBS 1.1.1 Design Parameters Jul 13 (Fri) **DONE**
WBS 1.1.1 System design Jul 18 (Wed) **DONE**
WBS 1.1.7 Infrastructure - part II Jul 20 (Fri) **DONE**
Workshop - Beam Simulation, part I Jul 24 (Tue) **DONE**
WBS 1.1.1 Instrumentation spec Jul 26 (Thu) **DONE**
WBS 1.1.2 Shielding of target hall Jul 27 (Fri) **DONE**
WBS 1.1.2 Hot Horn Handling Aug 3 (Fri) **DONE**
WBS 1.1.2 Horn Aug 10 (Fri) **DONE**
WBS 1.1.3 Horn power supply Aug 13 (Mon) **DONE**
WBS 1.1.1 Instrumentation Aug 14 (Tue) **DONE**
WBS 1.1.1 Extraction Permit System Aug 17 (Fri) **DONE**
Workshop - Beam Simulation, part II Aug 24 (Fri) **DONE**
Workshop - Installation schedule (US) Sep 5 (Wed) **DONE**
Workshop - Installation schedule (US) Sep 27 (Thu) **DONE**
WBS 1.1.2 Instrumentation Oct 18 (Thu) **DONE**
WBS 1.1 Commissioning plan Oct 19 (Fri) **DONE**
WBS 1.1.7 RAW system Oct 24 (Wed) **DONE**
Workshop - Installation schedule (DS) Oct 25 (Thu) **DONE**
WBS 1.1.4 Absorber #2 Nov 20 (Tue) **DONE**
WBS 1.1 Accident Conditions Nov 28 (Wed) **DONE**
WBS 1.1.5 Beam monitoring #2 Dec 10 (Mon) **DONE**
WBS 1.1.1 Beam optics #2 Dec 11 (Tue) **DONE**
WBS 1.1.2 Target & Target baffle #1 Dec 18 (Tue) **DONE**
Year 2002
=========
Workshop - Commissioning plan Jan 3 (Thu) **DONE**
WBS 1.1.1 Kicker Beam Tube Feb 1 (Fri) **DONE**
Workshop - Beam Optics Feb 25 (Mon) **DONE**
WBS 1.1 Installation Schedule Feb 20-21 **DONE**
WBS 1.1.3 Horn Transmission Line, Feb 26 (Tue) **DONE**
WBS 1.1.2 Remote Clamp,Trans Line Block Feb 26 (Tue) **DONE**
WBS 1.1.2 Hot Horn Handling #2 Feb 27 (Wed) **DONE**
Workshop - Beam Monitoring Design Mar 1 (Fri) **DONE**
WBS 1.1 Infrastructure #2 Mar 6 (Wed) **DONE**
WBS 1.1 Installation Schedule Mar 20-21 **DONE**
WBS 1.1.1 Beam Optics Director's Review Apr 2 (Tue) **DONE**
WBS 1.0 Director's Review Apr 23-24 **DONE**
WBS 1.1.1 Kicker cooling system Jun 14 (Fri) **DONE**
WBS 1.1.1 BPM electronics Jun 25 (Tue) **DONE**
WBS 1.1.1 & 1.1.3 Kicker System #2 Jul 1 (Mon) **DONE**
WBS 1.1 Radiation Safety Review Jul 17 (Wed) **DONE**
WBS 1.1.5 Beam Monitoring System Jul 24 (Wed) **DONE**
WBS 1.1.2 Baffle,Baffle &Target Carrier Aug 1 (Thu) **DONE**
WBS 1.1.1 Beam Optics Design (MI issues)Sep (ongoing series of meetings)
**DONE**
WBS 1.1 Risk Assessment Workshop #2 Oct 8 (Tue) **DONE**
WBS 1.1.1 Primary Beam Instr. & MW Oct 14 (Mon) **DONE**
WBS 1.1.7 US LCW Water Systems Valid. Oct **DONE**
WBS 1.1.1 Primary Beam Sensitivities Nov 1 **DONE**
WBS 1.1 Commissioning Plan Workshop Nov 5 **DONE**
WBS 1.1.2 Instr. & Monitoring Tgt Hall Nov 18 **DONE**
WBS 1.1.7 Horn RAW System Review Nov **DONE**
Director's Review (Installation focus) Dec 4 **DONE**
DOE Review of the NuMI Project Dec 9-11 **DONE**
Year 2003
=========
WBS 1.1.1 Main Injector & NuMI BPM Review March 4 **DONE**
WBS 1.1.5 Beam Monitoring (#3) March **DONE**
WBS 1.1.7 Horn RAW System Review March **DONE**
WBS 1.1 Commissioning plan (final) March **DONE**
WBS 1.1 L3 Manager Review of Controls March **DONE**
WBS 1.1 Accident Conditions Workshop March **DONE**
WBS 1.1.3,1.1.1 Conv.Magnets & PS(final) March/April **DONE**
Director's Review of NuMI Installation Plan April 8-9 **DONE**
WBS 1.1 Accident Conditions Workshop Mar/Apr **DONE**
WBS 1.1.3 Horn Transmission Line Apr 23 **DONE**
WBS 1.1 Final Review of Controls Apr **DONE**
DOE Review of the NuMI Project May 28-30 **DONE**
Target Hall Air System July 30 **DONE**
US Installation Aug 13 **DONE**
DS Installation Sep 18 **DONE**
Primary Beam Instrumentation Oct 24 **DONE**
Back to