NuMI BEAM PERMIT SYSTEM - 200 MODULE INPUTS
9-Aug-05
ORDER of CONNECTION of NuMI BEAM PERMIT SIGNAL
BP Signal Starts at MINOS SB ($E6) - To AAT ($E8) - To MINOS Detector Hall ($E7) - To MINOS SB ($E6) -
To MI-62 SB ($6C) - To THSR ($E6) - To MI-65 SB ($E4) - To MI-60 North ($70 and $73) - To MI-60 South ($63)
"60S" at MI-60 South Equipment Room
Ref # 200 Module Location  200 Module Input # Input Description  (Top of Rack MI60124)   (28 Characters Max)
60S-9 CC $63 N22 1 "60S" C204 / PCI Permit from MADC 65 
60S-10 2 NuMI CDC Permit (Safety Sys)
60S-11 3 I:KPS5S Kicker Status OK
60S-12 4 I:KPS6N Kicker Status OK
60S-13 5 No Beam in NuMI Kicker Gap
  6 thru 8 Spare Inputs (Jumpered to Current Source)
       
"60A" at MI-60 North Equipment Gallery
Ref # 200 Module Location  200 Module Input # Input Description  (Top of Rack MI60227)
60A-38 CC $70 N19 1 "60A" C204 / PCI Permit from MADC 44 
  2 thru 8 Spare Inputs (Jumpered to Current Source)
       
"60B" at MI-60 North Equipment Gallery
Ref # 200 Module Location  200 Module Input # Input Description  (Top of Rack MI60219)
60B-25 CC $73 N22 1 "60B" C204 / PCI Permit from MADC 38 
60B-26 2 I:LAM60 PS in Regulation
60B-27 3 I:LAM61 PS in Regulation
60B-28 4 E:V100 PS in Regulation
60B-29 5 E:HV101 PS in Regulation
  6 thru 8 Spare Inputs (Jumpered to Current Source)
       
"62A" at MI-62 Service Building Controls / Kicker Room
Ref # 200 Module Location  200 Module Input # Input Description  (Top of Rack MI62107)
62A-36 CC $6C N22 1 "62A" C204 / PCI Permit from MADC 79 
62A-37 2 E:V108 PS in Regulation
62A-38 3 NuMI Vacuum Valves Open
(E:BV100 E:BV112A E:BV112B)
62A-39 4 NuMI LCW Cooling OK E:MNWPLC
62A-48 5 NuMI LCW PLC Alive
  6 thru 8 Spare Inputs (Jumpered to Current Source)
       
"65A" at MI-65 Service Building Electronics Room
Ref # 200 Module Location  200 Module Input # Input Description  (Top of Rack MI65103)
65A-32 CC $E4 N22 1 "65A" C204 / PCI Permit from MADC 85 
65A-33 2 E:V118 PS in Regulation
  3 thru 8 Spare Inputs (Jumpered to Current Source)
"THA" at Target Hall Power Supply Support Room Underground of MI-65 Service Building
Ref # 200 Module Location  200 Module Input # Input Description  (Top of Rack THSR103)
THA-27 CC $E6 N20 1 "THA" C204 / PCI Permit from MADC 87 
THA-28 2 Target Hall PLC Alive
THA-29 3 E:NHSA Horn PS Rectifiers On
THA-30 4 E:NHSB Horn PS Rectifiers On
5 Spare Input (Jumpered to Current Source)
THA-31 6 Targt Hall Air Damper Closed
  7 and 8 Spare Inputs (Jumpered to Current Source)
       
"THB" at Target Hall Power Supply Support Room Underground of MI-65 Service Building
Ref # 200 Module Location  200 Module Input # Input Description  (Top of Rack THSR104)
THB-9 CC $E6 N21 1 "THB" C204 / PCI Permit from MADC 88 
THB-10 2 Target & Baffle RAW Skid OK
(Includes Target Helium Pressure E:BTHP01)
THB-17 3 Horn 1 RAW Skid OK
THB-23 4 Horn 2 RAW Skid OK
THB-29 5 Decay Pipe US RAW Skid OK
THB-35 6 Total Loss Mon Gas Flow OK
THB-36 7 Target & Baffle RAW Flow OK
  8 Spare Input (Jumpered to Current Source)
       
"MSB" at MINOS Service Building  Northwest Mechanical/Electrical Area
Ref # 200 Module Location  200 Module Input # Input Description  (Top of Rack MSB101)
MSB CC $E7 N22 1 thru 8 Spare Inputs (Jumpered to Current Source)
       
"MND" at MINOS Near Detector Hall    Underground of MINOS Service Building
Ref # 200 Module Location  200 Module Input # Input Description  (Top of Rack MND101)
MND CC $E8 N22 1 thru 8 Spare Inputs (Jumpered to Current Source)
       
"AAT" at Absorber Access Tunnel    Upstream End    Underground of MINOS Service Building
Ref # 200 Module Location  200 Module Input # Input Description  (Top of Rack AAT103)
AAT-1 CC $E9 N22 1 Absorber RAW Skid OK
AAT-7 2 Absorber Interm Cooling OK
AAT-11 3 Decay Pipe DS RAW Skid OK
AAT-16 4 Absorber Temperature OK
AAT-18 5 Absorber PLC Alive
AAT-19 6 AAT Air Damper Closed
  7 and 8 Spare Inputs (Jumpered to Current Source)