| Number | Title | Authors | Date |
|---|---|---|---|
| 1105 | Far Detector Timing Calibration | Blake A, Chapman J | 2005-10-03 |
| 1104 | A Study of Atmospheric Neutrino Oscillations in the MINOS Far Detector | Andy Blake | 2005-10-03 |
| 1101 | Alignment of the Near Detector Scintillator Modules Using Cosmic Ray Muons | Rustem Ospanov and Karol Lang | 2005-08-10 |
| 1100 | Design Study of the NuMI Target for 2 MW Upgrades | V.Garkusha, A.Mikheyev, I.Ponimash, A.Ryabov, T.Ryabova, F.Novoskoltsev, V.Zarucheisky | 2005-08-05 |
| 1093 | MINOS Blind Analysis Policy | Gary Feldman (on behalf of the Executive Committee) | 2005-07-09 |
| 1092 | Technical Design ot the Target Pile Protection Baffle | S.Filippov, V.Garkusha, R.Gibadullin, F.Novoskoltsev, I.Ponimash, T.Ryabova, V.Zarucheisky | 2005-07-13 |
| 1089 | Documentation of MINOS Detector Control Systems: Design and Implementation | E. Beall | 2005-05-26 |
| 1088 | Systematic Errors in the Steel Thickness of the MINOS Far Detector | David Boehnlein | 2005-06-30 |
| 1086 | Atmospheric Neutrinos in the MINOS Far Detector | Caius Howcroft | 2005-05-11 |
| 1085 | Simulation of Neutron Background to Atmospheric Neutrino Analyses | C. P. Ward | 2005-05-02 |
| 1084 | Calibration of the NuMI Beam Monitors | D.Indurthy, S.Mendoza, Z. Pavlovich, R.Zwaska, S.Kopp, D.Harris, A.Erwin | 2005-04-19 |
| 1076 | Design and Performance of the Readout System of the MINOS Far Detector | J. Oliver, N. Felt, G. Feldman, A. Lebedev, and R. Lee | 2005-02-24 |
| 1075 | NuMI Commissioning Report | NuMI Project Staff | 2005-02-25 |
| 1073 | Density of caldet steel | T. Durkin, S. Robertson | 2005-01-26 |
| 1068 | Studies of the Precision of Proton Beam Profile Monitor SEM's | Sacha Kopp, Zarko Pavlovic | 2005-01-10 |
| 1064 | Reconstruction of Atmospheric Neutrino Events in the MINOS Far Detector | Andy Blake | 2004-11-21 |
| 1061 | Steel Mass and Meltcode Distribution in the MINOS Far Detector | David Boehnlein, Robert Hatcher, Jim Kilmer, and Jeff Nelson | 2004-11-01 |
| 1049 | MINOS Far Detector Acceptance Study for Understanding Aspects of the Mufson Effect | P. Schreiner, V. Frohne, M. Goodman, T. Fields | 2004-09-02 |
| 1047 | Alignment of the MINOS Far Detector | B.Becker and D. Boehnlein | 2004-11-10 |
| 1044 | M16 Response and Cross Talk Simulation | Mike Kordosky, Karol Lang, Jing Liu and Patricia Vahle | 2004-07-31 |
| 1040 | Performance of Hamamatsu 64-anode photomultipliers for use with wavelength--shifting optical fibres | N. Tagg, A. DeSanto, A. Weber, et. al | 2004-07-07 |
| 1038 | Synchronization of the Fermilab Booster and Main Injector for Multiple Batch Injection | R. Zwaska (1), S. Kopp (1), W. Pellico (2), R. Webber (2) ((1) University of Texas at Austin, (2) Fermi National Accelerator Laboratory) | 2004-07-01 |
| 1037 | Proposal for a Cosmic Ray Veto Shield for MINOS | MINOS Collaboration | 2004-06-17 |
| 1031 | Investigation of Anomalous Single Photon Emission | L. Mualem | 2004-05-26 |
| 1030 | M16 Cross Talk Measurements | M. Kordosky, K. Lang, J. Liu and T. Vahle | 2004-05-10 |
| 1028 | Ion Chambers for Monitoring the NuMI Neutrino Beam at Fermilab | D. Indurthy et al | 2004-05-06 |
| 1027 | Profile Monitor SEM's for the NuMI Beam at FNAL | D.Indurthy, S. Kopp, Z.Pavlovich, S.Kopp | 2004-05-06 |
| 1026 | Non-Neutrino Particle Flux in the MINERVA Detector | M.A. Kostin and N.V. Mokhov | 2004-04-23 |
| 1023 | NuMI Target Vibration Measurements | Robert G. Wagner, Argonne National Laboratory | 2004-04-16 |
| 1018 | Calibration of the MINOS Detectors | Ryan Nichol | 2004-04-07 |
| 1017 | Choice of the readout system threshold for light-tightness measurements of Near Detector modules in New Muon Lab | V.Semenov (IHEP), A.Terekhov (Lebedev Inst.) and I.Trostin (ITEP) | 2004-05-25 |
| 1016 | The MINOS Environmental and Magnet Power Supply controls. | A. Erwin, H. Ping, C. Velissaris | 2004-04-02 |
| 1007 | Study of NuMI Critical Devices using MARS | S.I. Striganov | 2004-02-06 |
| 1002 | Optimization Studies of Beam Optics for the Low Energy Neutrino Production | V. Garkusha, F. Novoskoltsev | 2004-01-09 |
| 1001 | MuELoss: C++ software package for computing muon energy losses in the energy range up to 10 TeV | Costas Andreopoulos | 2004-01-01 |
| 998 | SexyPedestal Documentation | Anatael Cabrera | 2003-12-15 |
| 995 | Software Tools for Neutrino Interaction Model Validation | Costas Andreopoulos, Hugh Gallagher | 2003-11-19 |
| 994 | Results from the MINOS Far Detector 4 Plane Prototype | Costas Andreopoulos, Bruce Baller, Misha Ignatenko, Valeriy Makeev, Albero Marchionni, George Tzanakos and Larry Wai | 2003-11-18 |
| 993 | Spatial Tessellation Techniques for the MINOS Magnetic Field | Costas Andreopoulos, Elias Athanasopoulos and George Tzanakos | 2003-11-18 |
| 992 | MINOS 4 Plane Prototype Offline Analysis Framework | Costas Andreopoulos, Elias Athanasopoulos, Bruce Baller, Albero Marchionni and George Tzanakos | 2003-11-18 |
| 991 | Neural Network Techniques for Atmospheric Neutrino MC Event Classification and MINOS Sensitivity to | Costas Andreopoulos, Panos Stamoulis and George Tzanakos | 2003-11-18 |
| 990 | Expected Rates and Spectra of Upward-Going Muons and Contained Atmospheric Neutrino Interactions in | Costas Andreopoulos, Panos Stamoulis and George Tzanakos | 2003-11-18 |
| 989 | The Athens Test Stations for MINOS/Hamamatsu M16 Photomultipliers | Costas Andreopoulos | 2003-11-18 |
| 988 | Temperature effect on M16 PMTs | Costas Andreopoulos, Panos Stamoulis and George Tzanakos | 2003-11-18 |
| 987 | Post Production-Phase Mapping of the Athens Test Station Optical Multiplexer | Costas Andreopoulos, Panos Stamoulis, George Tzanakos and Miltos Zois | 2003-11-18 |
| 986 | Mapping of the Athens Test Station Optical Multiplexer | Costas Andreopoulos, Panos Stamoulis and George Tzanakos | 2003-11-18 |
| 985 | Dynamical Alignment of the Athens Test Station | Costas Andreopoulos, Panos Stamoulis and George Tzanakos | 2003-11-18 |
| 984 | The Athens Automated Test Station for Hamamatsu M16 PMTs | Costas Andreopoulos, Pavlos Pashalis, Niki Saoulidou, Panos Stamoulis, George Tzanakos and Miltos Zois | 2003-11-18 |
| 983 | The Small Athens Test Station for MINOS / Hamamatsu M16 PMTs | Costas Andreopoulos, Niki Saoulidou, Panos Stamoulis and George Tzanakos | 2003-11-18 |
| 976 | Studies of Crosstalk on the MINOS' Hamamatsu M64 Photomultipliers | Anatael Cabrera | 2003-12-19 |
| 965 | MARS Simulation: Baffle Heating | Byron Lundberg | 2003-09-30 |
| 964 | Surveying the Construction of Super Module 2 | B. Becker, R. Piteira, A. Sousa | 2003-09-30 |
| 957 | Use of the Mini DAQ to Test VFB Boards | Sergei Avvakumov and Richard Talaga | 2003-09-15 |
| 955 | Event Time-Profiling as MINOS Window to Atmospheric Neutrino Strangeness Production and Double Nucleon Decay | W. Anthony Mann | 2003-08-29 |
| 951 | Calibration of the MINOS Detectors and Extraction of Neutrino Oscillation Parameters | Chris Smith | 2003-08-05 |
| 950 | Calibration of the MINOS Detectors and Extraction of Neutrino Oscillation Parameters | Chris Smith | 2003-08-05 |
| 949 | Assessment of the MINOS Steel Design | Tony Ladran, John Alner, Bill Miller, Earl Peterson | 2003-08-05 |
| 948 | Systematic Uncertainties on dm2 from Neutrino Physics, using Calorimetry | Deborah A. Harris | 2003-07-29 |
| 947 | CalDet Hadron Data and Analysis | M. Kordosky, et al. | 2003-11-14 |
| 946 | CalDet External Trigger and Time of Flight System | M. Kordosky, et al. | 2003-11-14 |
| 942 | Modification of Droege HV Supplies for Ethernet Control of the Beam Monitoring Ion Chambers | A. R. Erwin, D. Glover, H. Ping | 2004-01-21 |
| 941 | Tests of Anomalous PMT Singles Rates due to MINOS Fibers | Jing Liu, Patricia Vahle, Mike Kordosky, Marek Proga and Karol Lang | 2003-07-21 |
| 935 | Minutes of the MINOS Collaboration meeting at Fermilab, June 12-15, 2003 | D. Ayres | 2003-07-03 |
| 934 | Hamamatsu R5900-00-M64 PMT Characteristics Measured by the Oxford Test Stand | A Cabrera, A De Santo, P S Miyagawa, N Tagg, A Weber | 2003-06-12 |
| 933 | Design of the Prototype NuMI Proton Beam Profile Monitor SEM | Sacha Kopp, Marek Proga | 2003-06-09 |
| 930 | Proposal for a Five Year Run Plan for MINOS | The MINOS Collaboration | 2003-05-30 |
| 929 | Parametric Study of MINOS Sensitivity to nm->ne Oscillations | Stanley Wojcicki | 2003-05-17 |
| 928 | Some Facts and Comments on Long-term M16 Gain Stability | Karol Lang, Jing Liu, Mike Kordosky, Marek Proga, Patricia Vahle | 2003-05-14 |
| 927 | Neutrino strange particle production at NuMI; atmospheric nu background in nucleon decay searches | W. Anthony Mann | 2003-05-13 |
| 926 | Studies of Beam Heating of NuMI Proton Beam Profile Monitors | Thomas Osiecki, Sacha Kopp | 2003-05-22 |
| 918 | A Description of the CandFitTrackSR Magnetic Track Fitting Package | Roy Lee | 2003-04-23 |
| 917 | Event Reconstruction in the Near Detector | Roy Lee | 2003-04-18 |
| 916 | A Description of the MINOS Reconstruction Framework | Roy Lee | 2003-04-18 |
| 913 | Module Surveys for Supermodule 1 | David Boehnlein | 2003-03-17 |
| 907 | Horizontal Muons and a Search for AGN neutrinos in Soudan 2 | D. Demuth et al. | 2003-03-05 |
| 902 | FarDet FEE Debug and Replacement Proceedures | Mike Kordosky | 2003-01-27 |
| 901 | Far Detector Front End Electronics Documentation | Nathan Felt, Andre Lebedev, Roy Lee, John Oliver | 2003-01-23 |
| 898 | Soudan VIsitors Guide | W.L.Barrett E Peterson E Amos | |
| 895 | Minutes and Notes from the Near Detector Installation Working Group on December 12, 2002 | Jonathan Thron | 2002-12-20 |
| 887 | Beam Tests of Ionization Chambers for the NuMI Neutrino Beam | Robert M. Zwaska, James Hall, Sacha E. Kopp, Huican~Ping, Marek Proga, Albert R. Erwin, Christos Velissaris, Deborah A. Harris, Donna Naples, Jeffrey McDonald, David Northacker, Milind Diwan, and Brett Viren | 2002-12-05 |
| 886 | Status of the MINOS experiment | Milind V. Diwan | 2002-11-25 |
| 883 | The NuMI Neutrino Beam and Potential for an Off-Axis Experiment | Sacha E. Kopp | 2002-10-31 |
| 880 | Detector R&D for future Neutrino Experiments with the NuMI Beamline | G. Barenboim et al., | 2002-10-23 |
| 878 | Survey Procedure - Revision 4 | David Boehnlein and Andrew Godley | |
| 876 | Per Scintilator Module Alignment with Straight Muons | Brett Viren | 2002-10-15 |
| 873 | Transparencies from the NuMI off-axis meeting at UC London, Sept. 16, 2002 | D. Ayres | 2002-10-02 |
| 868 | Quality Control Survey Measurements at the MINOS Far Detector | David Boehnlein | 2002-09-10 |
| 866 | Surveying the Construction of Super Module 1 | Bernard Becker Andrew Godley | 2002-09-04 |
| 865 | MARS Simulation of MI Worst Case Accident Dose Rates in NuMI Carrier Tunnel | S. Striganov, M. Kostin, N. Grossman | 2002-11-08 |
| 864 | Cross-Hair System Performance Requirements | Debbie Harris | 2002-09-26 |
| 863 | Accelerator Improvement Options for NuMI Proton Intensity | Choudhary, Fields, Foster, Griffin, Lucas, Marchionni, Martin, Michael, Prebys, Pruss | 2002-08-09 |
| 860 | Users Guide to the CandEventSR Reconstruction Tree | R Lee | 2002-08-05 |
| 859 | Air Fields Measured while Commissioning the SM1 Magnet at Soudan | Andrew Godley, Walter Jaskierny, Jim Kilmer, Jerry Meier, Jeff Nelson | 2002-08-07 |
| 858 | Radioactivity of MINOS detector components and environment; estimation of counting rates | Keith Ruddick | 2002-07-29 |
| 857 | MINOS Far Detector rates from Carbon-14. | Chuck Bower | 2002-07-19 |
| 856 | Plane by Plane muon alignment study of SM1 | Bernard R. Becker | 2002-07-24 |
| 850 | Preliminary Design of a Radiation-Hard Pad Ionization Chamber Array | D. Naples, A. Erwin, D. Northacker | 2002-07-18 |
| 845 | Radiation Dose Calculations for Monitoring System | Deborah Harris, Nancy Grossman | 2002-07-15 |
| 844 | Radiation Dose Calculations for Monitoring System | Nancy Grossman, Deborah Harris | 2002-07-08 |
| 842 | MINOS Far Detector Gamma Background and Rate Prediction | Chuck Bower | 2002-07-02 |
| 840 | Use of the Soudan 2 Shield in MINOS | H. Gallagher et al. | 2002-07-11 |
| 836 | Ionization Chambers for Monitoring in High-Intensity Charged Particle Beams | J. McDonald, D. Naples, C. Velissaris, A. Erwin, H. Ping, B. Viren, M. Diwan | 2002-05-11 |
| 834 | A Demultiplexing Algorithm for Cosmic Rays in the MINOS Far Detector | B. Rebel S. Mufson | 2002-04-25 |
| 828 | First Use of Module Survey Data from the MINOS Far Detector | Leon Mualem | 2002-04-03 |
| 827 | MINOS Master Clock System, Preliminary Design Specification | Tom Fitzpatrick, Carmen Rotolo | 2002-03-22 |
| 826 | Technical Requirements for the MINOS Near Detector Master Clock | Gary Drake, Tom Fitzpatrick, Charlie Nelson, Carmen Rotolo | 2002-03-22 |
| 825 | Technical Design Specification of the MASTER Module for the MINOS Near Detector Front End Electroni | John Dawson, Gar Drake, Bill Haberichter, Dave Reyna | 2002-03-22 |
| 823 | Studies of Cross Talk Between Ion Chambers | Robert Zwaska, Evan Fuller, Sacha Kopp | 2002-03-24 |
| 822 | Outline of the Air Handling System in the Far Detector | A.R. Erwin, W. Miller, H. Ping, C. Velissaris, Y. Liu | 2002-03-04 |
| 820 | Testing of Hamamatsu R5900-00-M64 Multi-Pixel PMTs for MINOS | M. A. Barker A. De Santo. P. Dervan, K. Lang, P. S. Miyagawa, R. Saakyan, C. Smith, D. Michael, J. Thomas, A. Weber | 2002-02-08 |
| 816 | Comments on Off-axis Beams | Stanley Wojcicki | 2002-01-14 |
| 814 | A time dependent solution for an ionization chamber charge density. | Christos Velissaris | 2002-01-17 |
| 811 | Minutes of the MINOS Collaboration meeting at Caltech, January 3-6, 2002 | D. Ayres | 2002-01-24 |
| 810 | An Achromatic Bend for the NUMI Primary Beam | David C. Carey | 2002-01-10 |
| 809 | Transparencies from the MINOS Collaboration Meeting at Caltech, Jan. 2002 | D. Ayres | 2002-01-30 |
| 806 | Near detector readout cables spec | J Alner B Anderson T Durkin | 2001-12-20 |
| 805 | Checkerboard wiring for the M64 Alner boxes | Phil Adamson | 2001-12-18 |
| 804 | Observations on the NUMI Proton Beam | David C. Carey | 2001-12-12 |
| 803 | PIC ATF Beam Test Results | J. McDonald, D. Naples, M. Diwan, A. Erwin, X. Ping, C. Velissaris, and B. Viren | 2001-12-04 |
| 801 | Beam Tests of NuMI Ionization Chambers at the Fermilab Booster Accelerator | Robert Zwaska, James Hall, Evan Fuller, Debbie Harris, Sacha Kopp, Albert Erwin | 2001-12-03 |
| 800 | Ionization Chambers used at the Fermilab Booster Test Beam | Robert Zwaska, Sacha Kopp, Marek Proga | 2001-12-03 |
| 799 | Neutrino Oscillation Parameters from MINOS, ICARUS and OPERA combined | V. Barger, A.M. Gago, D. Marfatia, W.J.C. Teves, B.P. Wood and R. Zukanovick Funchal | 2001-11-21 |
| 797 | Study of gain non-uniformity of M16 PhotoMultiplier | Jing Liu,Patricia Vahle, Mike Kordosky, and Karol Lang | 2001-11-19 |
| 796 | Locating the neutrino beam elements | Adam Para | |
| 795 | Crosstalk Measurements at the Far Detector | Roy Lee Sharon Seun | 2001-11-26 |
| 793 | Mapping measurements of the M16 PMT test stands | easured. | 2001-12-07 |
| 789 | Transparencies from the October 2001 MINOS Collaboration meeting | D. Ayres | 2001-11-14 |
| 788 | Note on Measuring the nu_mu Disappearance Curve with Optimal Errors in the Shortest Period of Time | Vittorio Paolone University of Pittsburgh | 2001-10-19 |
| 787 | NuMI FACILITY TECHNICAL DESIGN REPORT - Appendix C | D. Bogert et al Edited by D. Pushka and L. Read | 2001-10-18 |
| 786 | Nautrino Oscillations Experiments using Off-axis NuMI Beam | A. Para, Fermilab, M. Szleper, Noerthwestern | 2001-10-15 |
| 785 | Downstream Hadron Monitor Requirements for the NuMI Beamline | Debbie Harris | 2001-11-17 |
| 784 | The Placement of Survey Monuments in the MINOS Far Detector Hall | David Boehnlein | 2001-11-01 |
| 783 | Proposal for Continuously-Variable Beam Energy | M. Kostin, S. Kopp, M. Messier, D. Harris, J. Hylen, A. Para | 2001-10-17 |
| 781 | Neutrino Spectrumj at the Far Detector | M. Szleper, A. Para | 2001-09-30 |
| 780 | Outline of a shallow underwater main injector neutrino oscillation | Alec Habig, David Petyt, and Lawrence Wai | 2001-10-09 |
| 777 | Effect of the Decay Pipe Window, Vacuum on Neutrino Fluxes | Mikhail Kostin, Sacha Kopp, Mark Messier, Adam Para | 2001-09-14 |
| 776 | Status of the MINOS Experiment | Elizabeth Buckley-Geer | 2001-09-12 |
| 774 | Transparencies from the September 11-13 Review of the NuMI project | The MINOS Collaboration | 2001-10-03 |
| 769 | Pad Ionization Chamber Design | D. Naples et al., | 2001-08-07 |
| 768 | Hadron Production Models Revisited | S. Kopp, M. Kostin and R. Zwaska | 2001-08-01 |
| 766 | An estimate of NuMI neutrino flux systematic error due to uncertainty in the dE-dX analysis of secondary hadron production in NA49 data | Larry Wai | 2001-07-25 |
| 765 | Proposal to Measure the Speed of Mu-type Neutrinos to To Two Parts in 10**6 | Tim Bergfeld, Carl Rosenfeld, S. Mishra and A. Godley | 2001-07-25 |
| 762 | Study of Hadron production models with hadron monitors | Michal Szleper | 2001-06-27 |
| 759 | Minutes of the MINOS Collaboration meeting at Ely | David Ayres | 2001-07-19 |
| 758 | Transparences from the MINOS Collaboration meeting at Ely | David Ayres | 2001-07-12 |
| 757 | Study of QIE Digitization in the Near Detector | David Reyna | 2001-06-01 |
| 756 | Muon Monitoring Requirements for the NuMI Beamline | D. Harris & the Muon Monitoring Group | 2001-06-01 |
| 755 | Results of the Hadron Monitor Review of May 17, 2001 | B. Baller | 2001-06-11 |
| 754 | Saturation curve formulation of a pulse mode ionization chamber | Christos Velissaris | 2001-06-05 |
| 753 | Light Injection mapping and MUX boxes in the far detector | Phil Adamson | 2001-07-09 |
| 752 | Preliminary Analysis of NA49 minimum bias 158 Gev p-Al hadron production data | Larry Wai and Bradley Patterson | 2001-06-01 |
| 750 | PMT Installation for the MINOS Calibration Detector | Mike Kordosky | 2001-06-21 |
| 749 | Current Leakage Analysis of M16 bases | Jason Day and Karol Lang | 2001-05-31 |
| 747 | Oscillation Measurements with upgraded conventional neutrino beams | V. Barger et al. | 2001-04-20 |
| 746 | Hadron Monitors | A. Dabrowski et al. | 2001-05-31 |
| 745 | TRANSPARENCIES FROM THE May 2001 DOE REVIEW OF THE NuMI PROJECT | D. Ayres | 2001-05-26 |
| 744 | A study of particle fluxes at monitoring stations | G. Unel and M. Velasco | 2001-04-01 |
| 743 | The MINOS Light Injection Calibration System | P. Adamson, J. Alner, B. Anderson, T. Chase, P. J. Dervan, T. Durkin, E. Falk, P. G. Harris, D. G. Michael, R. Morse et al. | 2001-05-01 |
| 742 | The Soudan Visitors Guide (out of date - NuMI-898 is the update) | W. Barrett | 2001-05-17 |
| 741 | The Effects of Varying the VA Chip Preamplifier Feedback Voltage | Roy Lee | 2001-05-09 |
| 739 | Testing the Light Injection Calibration System for MINOS | P. Adamson et al., | 2001-03-30 |
| 738 | An automatic Nuclear Emulsion Scanning System | Bradley Patterson, Larry Wai and Stan Wojcicki | 2001-05-03 |
| 737 | Summary of the NuMI Project | The Fermilab NuMI Project Staff and the MINOS Collaboration | 2001-05-01 |
| 736 | Procedures for Shipping to the Soudan Underground Laboratory | Jeff Nelson, Bill Miller & J. Zorman | 2001-05-01 |
| 731 | Minutes of the March 2001 MINOS Executive Committee meeting at Fermilab | P. Litchfield | 2001-03-12 |
| 729 | Minutes of the MINOS Collaboration meeting at Fermilab | D. Ayres | 2001-03-27 |
| 728 | Transparencies of the March 2001 MINOS meeting at Fermilab | D. Ayres | 2001-03-27 |
| 727 | Update of NuMI Absorber Conceptual Design | A. Wehmann | 2000-10-01 |
| 726 | The Status of MINOS, Contribution to the Cairo International Conference on High Energy Physics | P.G. Harris | 2001-03-16 |
| 725 | A Demultiplexing Algorithm for the MINOS Far Detector | B. Rebel, S. Mufson | 2001-03-08 |
| 723 | A new calculation of numu to nue sensitivity in THESEUS | D. Petyt | 2001-03-05 |
| 721 | numu to nue sensitivity in THESEUS, an update | P. Litchfield | 2001-02-01 |
| 719 | Effect of Beam Plugs and the Hadron Hose | Brett Viren | 2001-07-06 |
| 718 | A Study of Honeycomb deformation under the combined influence of stress and Heat | A. Erwin et al | 2001-01-29 |
| 717 | Principles of ionization chamber operation under intense ionization rates | C. Velissaris | 2001-01-29 |
| 714 | A study of nu_mu to nu_e sensitivity in MINOS | Milind Diwan, Mark Messier, Brett Viren, Lawrence Wai | 2001-02-14 |
| 713 | Matter Enhanced Numu to Nue oscillations in NuMI | Larry Wai and Bradley Peterson | 2001-01-09 |
| 712 | P-907, Proposal to Measure Particle Production in the Meson Area Using Main Injector Primary and Secondary Beams | Y. Fisyak et al. | 2001-01-01 |
| 710 | Calculations and Mapping of the Magnetic Field in the Prototype Horn 1 | A. Abramov et al | 2000-12-14 |
| 709 | Energy Deposition in the NuMI Neutrino Beam Line | F. Novoskoltsev | 2000-12-20 |
| 707 | Minutes of the December 2000 MINOS Institutional Board meeting at Stanford | Peter Litchfield | 2000-12-08 |
| 706 | Minutes of the December 2000 MINOS meeting at Stanford | D. Ayres | 2000-12-08 |
| 704 | A POSITION AGAINST THE NEED FOR ALNER BARS IN MINOS MODULE INSTALLATION | J. Grudzinski | 2000-12-12 |
| 703 | MINOS magnets | Jeff Nelson | 2000-08-01 |
| 701 | Effect of the Hadronic Hose on MINOS Physics | L. Buckley-Geer et al., | 2000-12-01 |
| 700 | Neutrino Fluxes, Hadron Production and the Hadronic Hose | M. Messier et al., | 2000-12-01 |
| 699 | Study of Numu to Nue detection in THESEUS Using Scanning and Soudan Standard Event Reconstruction | J. Chung, T. Kafka, W. Mann and W. Oliver | 2000-12-01 |
| 697 | Transparencies of the December 2000 Lehman Review at Fermilab | D. Ayres | 2000-12-01 |
| 696 | Muon Momentum from Multiple Scattering Measurements in THESEUS | J. Schneps and A.B. Sousa | 2000-11-21 |
| 695 | Thermal Stress Analysis of NuMI Baffle | Bob Wands | 2000-11-08 |
| 694 | Calibration of MINOS detectors using Cosmic Ray Muons | Roy Lee and Sharon Seun | 2000-11-01 |
| 693 | Specification For the Production and Assembly of the MINOS Light Injection Calibration System Pulser Boxes and Fibre Bundles | Philip Harris | 2000-11-01 |
| 692 | Light Injection Operation and Data Rates | Philip Harris | 2000-11-01 |
| 691 | Numu to nusterile in MINOS | D. Petyt | 2000-11-08 |
| 689 | MINOS long-baseline search for neutrino oscillations at Fermilab | K. Lang | 1997-08-19 |
| 688 | A comprehensive characterization of the Hamamatsu 16- and 64-anode PMTs | K. Lang et al., | 2000-06-06 |
| 687 | MINOS detectors for Neutrino Interactions | K. Lang | 2000-06-23 |
| 686 | A Proposal for Storage of Data from the PMT Test Stand | Karol Lang et al., | 2001-06-01 |
| 685 | A first look at afterpulsing in R5900-00-M64 PMTs | Barker, De Santo, Weber | 2000-06-01 |
| 684 | Non-linearity effects on the performances of R5900-00-M64 photo-multipliers | Barker, De Santo, Weber | 2000-06-01 |
| 683 | Quality checks of the Oxford PMT scanning set-up | Barker, De Santo, Weber | 2000-06-01 |
| 682 | Results from production tests of 13 R5900-00-M64 photo-tubes | Barker, De Santo, Weber | 2000-06-01 |
| 681 | Proposal for PS test beam time for the MINOS calibration module | J. Thomas et al., | 2000-10-01 |
| 680 | A description of the THESEUS proposal | Maury Goodman, Sanjib Mishra et al. | 2001-01-01 |
| 679 | Report of the THESEUS Working Group | G. Bock et al., | 2000-11-28 |
| 678 | Summary of the NuMI Project | The Fermilab NuMI Project Staff and the MINOS Collaboration | 2000-11-01 |
| 677 | Comparing the far-to-near ratios of the spectra of CC events for the PH2he and PH2le beams, a route to nutau appearance? | A. Asratyan and V. Verebryusov | 2000-10-01 |
| 676 | Extruded Polystyrene Scintillator for MINOS | Brajesh Choudhary | 2000-08-01 |
| 675 | Dynamic Stress Calculations for ME and LE Targets and Results of Prototyping for the LE target | A.Abramov, S.Filippov,N.Galyaev, V.Garkusha, R.Gibadullin, I.Ponimash, A.Ryabov, V.Zarucheisky | 2000-08-10 |
| 673 | Minutes of the September 2000 MINOS Executive Committee at Fermilab | Peter Litchfield | 2000-09-23 |
| 672 | Minutes of the September 2000 MINOS Institutional Board meeting at Fermilab | Peter Litchfield | 2000-09-23 |
| 671 | Minutes of the September 2000 MINOS Collaboration meeting at Fermilab | D. Ayres | 2000-09-23 |
| 670 | Transparencies of the September 2000 MINOS meeting at Fermilab | D. Ayres | 2000-09-23 |
| 669 | The MINOS Collaboration Bylaws, version 3.4, (approved except Article 9) | K. Lang | 2000-09-25 |
| 668 | NuMI Quality Assurance Plan | Dave Boehnlein | 2000-05-08 |
| 667 | Status of the MINOS Experiment | Stanley Wojcicki | 2000-08-01 |
| 662 | Minutes of Integration Working Group | Rob Plunkett | 2000-01-27 |
| 661 | Photoelectron Counting by Several Methods | P. Adamson et al., | 2000-08-01 |
| 660 | Tau to pi in THESEUS | D. Petyt | 2000-08-01 |
| 659 | Muon momentum estimation in Theseus from measurements of the sagitta of tracks | J. Cobb | 2000-08-09 |
| 657 | Summary of the electronics-light injection system session at Ely | J. Thron | 2000-06-14 |
| 656 | Minutes of the Electronics Hardware Working Goups at Ely | J. Thron | 2000-06-14 |
| 655 | Approximate Beam Alignment Check by Measuring the Far Event Spectrum | W. Smart | 2000-06-14 |
| 652 | Advanced Conceptual Design of the NuMI hadron beam Absorber Core | A. Abramov et al., | 2000-06-30 |
| 651 | Probing Nutau appearance with Quasielastics | A. Asryatan and V. Verebyrshov | 2000-06-20 |
| 650 | A More Rigorous Description of the Influence of Magnetic Fields on Hamamatsu M64 Photomultipliers in Relation to the MINOS Experiment | Matthew A. Barker and Alfons Weber | 2000-07-18 |
| 649 | Minutes of the Executive Committee Meeting from the June 2000 MINOS meeting at Ely | Peter Litchfield | 2000-06-14 |
| 648 | Minutes of the June 2000 MINOS Institutional Board meeting at Ely | Peter Litchfield | 2000-06-14 |
| 647 | Minutes of the MINOS Collaboration meeting at Ely, June 9-15, 2000 | D. Ayres | 2000-07-17 |
| 646 | Transparencies of the June 2000 MINOS meeting in Ely | D. Ayres | 2000-06-14 |
| 645 | Background Measurements for Outriggers | D. Boehnlein & Alexei Kulik | 2000-05-01 |
| 644 | 2nd MINOS Magnetics Review: Update and Response to Reviewers' Comments | Jeff Nelson | 2000-12-01 |
| 643 | Probing the numu disappearance with low nu and quasielastic events | A. Asratyan & V. Verebryusov | 2000-06-02 |
| 641 | Size and Shape of the Calibration Module | P. Litchfield | 2000-05-31 |
| 640 | Seismic Criteria for NuMI Target Hall Shielding | S. Kamal | 2000-06-12 |
| 639 | Measurement of MINOS Steel Plates with Ultrasound | Milind Diwan and Jeff Nelson | 2000-05-23 |
| 638 | Transparencies of the May 2000 Lehman Review at Fermilab | D. Ayres | 2000-05-01 |
| 637 | Tests of the Leica Total Station for Survey and Alignment of the MINOS detectors | D. Boehnlein | 2000-05-01 |
| 636 | Overview of the MINOS Magnet Monitoring Systems | Walt Jaskierny, Jim Kilmer, Cecil Needles, Jeff Nelson, Bob Trendler, and Bob Wands | 2000-05-15 |
| 635 | Soudan Minecrew Hiring Plan, WBS 2.4 and 3.4 | D. Ayres & W. Miller | 2000-05-01 |
| 634 | Far Detector Checkout and Commissioning: Facilities and Procedures (WBS 2.4) | D. Ayres & W. Miller | 2000-05-01 |
| 633 | Far Detector Installation Procedures, WBS2.4 | D. Ayres & W. Miller | 2000-05-01 |
| 632 | Far Detector Materials Handling Facilities and Procedures, (WBS 2.4) | D. Ayres & W. Miller | 2000-05-01 |
| 631 | Summary of the NuMI Project | The Fermilab NuMI Project Staff and the MINOS Collaboration | 2000-05-01 |
| 630 | Multiplexing and Reconstruction in the Near Detector | Roy Lee and Mark Szigety | 2000-05-01 |
| 628 | Overview of the Front End Electronics for the Near Detector," Version 1.35 | G. Drake, J. Dawson, C. Nelson | 1999-11-15 |
| 627 | Conceptual Design of the VME Interface for the MINOS Near Detector," Version 2.3 | J. Dawson, G. Drake, S. Madani, C. Nelson, T. Nicholls, G. Pearce | 2000-05-03 |
| 626 | Conceptual Design of the Clock System for the MINOS Near Detector," Version 1.3 | J. Dawson, G. Drake, C. Nelson | 2000-05-08 |
| 624 | Checkerboard PMT cookie wiring for M64s in the near detector | Phil Adamson | 2000-04-27 |
| 623 | Fibre routing for far detector pin diodes | P. Adamson et al., | 2000-04-27 |
| 622 | Crosstalk Measurements in M16 at Sussex | P. Adamson | 2000-03-20 |
| 621 | Minutes of the electronics working group | J. Thron | 2000-04-25 |
| 620 | Design Considerations for a Small Ionization Chamber for NuMI Hadron Monitor | S. Eichblatt et al., | 2000-08-01 |
| 619 | Minutes of the Executive Committee Meeting from the April 2000 MINOS meeting at FNAL | Peter Litchfield | 2000-04-16 |
| 618 | Minutes of the February 2000 MINOS Institutional Board meeting at FNAL | Peter Litchfield | 2000-04-16 |
| 617 | Minutes of the April 2000 Collaboration meeting at FNAL | Dave Ayres | 2000-04-16 |
| 616 | Transparencies of the April MINOS Collaboration meeting at Fermilab April 14-16, 2000 | D. Ayres | 2000-04-16 |
| 615 | ANL test of aluminum wire | J. Hylen et al., | 2000-04-01 |
| 614 | Calculation of MINOS Near Detector Height | R. Plunkett and C. James | 2000-04-07 |
| 612 | Physics Potential of the three PH2 beam designs | D. Petyt | 2000-04-06 |
| 610 | NuMI Hadronic Hose Technical Design Report | J. Hylen et al. | 2000-04-10 |
| 609 | Comparison of PH2L and PH2M for small delta m^2 | R.H. Bernstein | 2000-03-14 |
| 608 | Effect of Horn Displacement in PH2M | R.H. Bernstein | 2000-03-06 |
| 607 | Effects of Reconstruction Systematics with PH2L | R.H. Bernstein | 2000-03-03 |
| 606 | Plan for Interfacing the LED Flasher System with the Electronics from the 12-Feb-00 Electronics Working Group Discussion | J. Thron | 2000-02-15 |
| 605 | The MINOS collaboration, Proposal for PS test beam time for MINOS calibration module | The MINOS Collaboration | 2000-03-08 |
| 603 | Relative Optical Coupling Efficiency of Wavelength Shifting Fiber to Extruded Scintillator Strips | M. Ignatenko & V. Makeev | 2000-03-01 |
| 602 | Effects of Magnetic Fields on Hamamatsu R5900-00-M64 PMTs | M. Barker and Alfons Weber | 2000-03-09 |
| 601 | Measuring the Neutrino Beam Center at the MINOS far Location | A. Kulik, J. Morfin, J. Nelson and V. Paolone | 2000-06-05 |
| 600 | Minutes of the Feb 2000 MINOS Steel & Coil Working Group Meeting | J. Nelson | 2000-02-01 |
| 599 | Minutes of the Electronics Working group February 2000 | J. Thron | 2000-02-01 |
| 598 | Minutes of the Executive Committee at the February 2000 MINOS meeting | P. Litchfield | 2000-03-02 |
| 597 | Minutes of the February 2000 MINOS Institutional Board meeting | Peter Litchfield | 2000-02-16 |
| 596 | Minutes of the February 2000 Collaboration meeting | D. Ayres | 2000-03-08 |
| 595 | Transparencies from the February MINOS meeting at Fermilab | D. Ayres | 2000-02-10 |
| 593 | Minutes of the January 27 2000 Integration Working Group | R. Plunkett | 2000-01-27 |
| 590 | Measurements of Gain and Noise Properties of Hamamatsu M64 PMT's | Paul Miyagawa, Alfons Weber and Colin Perry | 2000-02-07 |
| 589 | Technical Specifications For The Procurement Of Wavelength Shifting Fibre | Brajesh Chandra Choudhary and Leon Mualem | 2000-03-28 |
| 588 | Economy-Class Emulsion Detector for MINOS | A. Asratyan and V. Verebryusov | 2000-01-11 |
| 587 | More Multiplexing Schemes | William Oliver | 2000-01-10 |
| 586 | Monitoring Background Radiation in the MINOS Near Detector Hall | D. Boehnlein | 2000-01-06 |
| 584 | Minutes of the Integration Working group at the Dec 1999 MINOS meeting | R. Plunkett | 1999-12-10 |
| 583 | Minutes of the Minos Computing Advisory Committee (MICAC) Meeting FNAL | J. Urheim | 1999-12-11 |
| 582 | A study of the Active Coil Bypass in the Near Detector | Steve Eichblatt | 1999-12-17 |
| 581 | Minutes of the Electronics Working Group at the December 1999 MINOS meeting | J. Thron | 1999-12-11 |
| 580 | Minutes of the Executive Committee at the December 1999 MINOS meeting | M. Goodman | 1999-12-17 |
| 579 | Minutes of the December 1999 MINOS Institutional Board meeting at Fermilab | P. Litchfield | 1999-12-17 |
| 578 | Minutes of the December MINOS meeting at Fermilab | D. Ayres | 2000-01-04 |
| 577 | Transparencies from the December MINOS meeting at Fermilab | D. Ayres | 1999-12-10 |
| 576 | Nu_mu to Nu_e in MINOS | D. Petyt | 1999-12-21 |
| 575 | The Hadron-Rescattering background to the Kink Signature of the tau | Ashot Asratyan and Valery Verebrysusov | 1999-12-06 |
| 573 | Measurement of M16 interpixel crosstalk | W. Oliver and J. Schneps | 1999-12-22 |
| 571 | Transparencies from THE DOE REVIEW OF THE NUMI PROJECT AT FERMILAB | M. Goodman | 1999-11-16 |
| 570 | Hadronic Production Systematic Errors | J. McDonald and D. Naples | 1999-11-12 |
| 563 | Minutes of the Integration Group October 1999 | R. Plunkett | 1999-10-17 |
| 562 | NuMu to NuE Detection in TheSEUS | H. Gallagher and P. Litchfield | 1999-11-01 |
| 560 | Summary of the NuMI Project | The Fermilab NuMI Project Staff and the MINOS Collaboration | 1999-06-01 |
| 559 | Expression of Interest for R&D towards a Neutrino Factory Based On a Muon Storage Ring and a Muon Collider | Kirk McDonald (editor) for the Neutrino Factory Collaboration | 1999-11-07 |
| 557 | Minutes of the 2nd MINOS executive committee meeting at RAL | Maury Goodman | 1999-11-01 |
| 555 | Minutes of the October 1999 MINOS Institutional Board meeting at RAL | P. Litchfield | 1999-08-01 |
| 554 | Minutes of the October 1999 MINOS Meeting | D. Ayres | 1999-11-17 |
| 553 | Transparencies from the MINOS Rutherford Meeting October 1999 | M. Goodman | 1999-10-17 |
| 552 | Soudan Radioactive Material Analysis Results | Dave Pushka, Vernon Cupps, Steven Benesch and Elizabeth Kershisnik | 1999-10-01 |
| 551 | THE Second Experiment Underground at Soudan THESEUS | Louis Barret et al., | 1999-12-14 |
| 550 | The Light Injection Calibration System | Phillip Harris | 1999-10-12 |
| 549 | MINOS Far Detector Lab Design Criteria Document for the Cavern and Detector Outfitting | D. Ayres, A. Byon-Wagner, J. Kilmer, W. Miller, J. Nelson, E. Peterson, R. Plunkett, D. Pushka, R. Trendler | 1999-12-01 |
| 548 | Physics Justification for a Hybrid Emulsion Detector in MINOS | The MINOS collaboration | 1999-10-01 |
| 547 | Calculation of Numu to Nue neutrino oscillation signals in a MINOS hybrid emulsion detector | Lawrence Wai and Stanley Wojcicki | 1999-10-29 |
| 546 | Robotic Repair for NuMI Hadronic Hose | S. Childress, J. Anderson Jr., C. Kendziora | 1999-10-01 |
| 544 | Four Plane Prototype Module Production at Argonne | Tacy Joffe-Minor | 1999-10-11 |
| 543 | Advanced Conceptual Desgin of the Low Energy Target and Beam Plug | A. Abramov et al., | 1999-09-30 |
| 542 | Proposal to include the Hadronic hose in the NuMI beamline | J. Hylen et al., | 1999-10-12 |
| 541 | Future Direction of Module Production Equipment | Jim Grudzinski | 1999-09-15 |
| 540 | Summary of the August Electronics Subgroup Meeting at Fermilab | J. Thron | 1999-08-26 |
| 537 | Transparencies from the MINOS Fermilab Meeting August 1999 | D. Ayres | 1999-08-01 |
| 536 | performance of a least-squares based muon reconstruction procedure for MINOS | Adamson, A. Para and Jenny Thomas | 1999-08-01 |
| 535 | Checkerboard MUXing, How to Minimize PMT Crosstalk problems | Philip Harris | 1999-09-09 |
| 534 | Minutes of the Executive Committee | Maury Goodman | 1999-08-27 |
| 533 | Minutes of the August 1999 MINOS Institutional Board meeting at Ely | Peter Litchfield | 1999-08-27 |
| 532 | Minutes of the August 1999 MINOS Collaboration Meeting at Fermilab | Dave Ayres | 1999-08-01 |
| 530 | The Eyes of MINOS Optometry of R5900-00-M16 PMT's | Karol Lang | 1999-08-01 |
| 525 | Optimization of a hybrid emulsion detector for MINOS | Bogdan Bernevig, Noah Smith, Lawrence Wai and Stanley Wojcicki | 1999-08-20 |
| 518 | The Soudan 2 detector as a tracking and trigger syste emulsion modules | W. P. Oliver | 1999-07-23 |
| 517 | Session summary -- near detector integration, Ely 1999 | Rob Plunkett | 1999-06-14 |
| 516 | Session summary -- far detector integration, Ely 1999 | Rob Plunkett | 1999-06-14 |
| 515 | Session summary -- far detector outfitting, Ely 1999 | Rob Plunkett | 1999-06-14 |
| 513 | Minutes of the June 1999 Executive Committee Meeting (Ely) | Maury Goodman | 1999-06-14 |
| 512 | Minutes of the June 1999 MINOS Institutional Board meeting at Ely | Peter Litchfield | 1999-06-14 |
| 511 | Minutes of the June 1999 Collaboration meeting at Ely | Dave Ayres | 1999-06-14 |
| 508 | Answers to PAC questions about beam | S. Wojcicki | 1999-06-10 |
| 507 | Transparencies from the MINOS Week in the Woods June 1999 | D. Ayres | 1999-06-14 |
| 506 | Measurement of the dependence of the light yield on the depth of the groove in extruded scintillator | W. P. Oliver and J. Schneps | 1999-06-11 |
| 503 | Soudan Gamma-rate Study | Alexei Kulik | 1999-03-17 |
| 501 | IHEP Task C Report | Gorkusha et al., | 1999-05-01 |
| 500 | Transparencies from the May 1999 NuMI DOE Review at Fermilab | D. Ayres | 1999-05-18 |
| 499 | MINOS Software Planning Group Report | P. Litchfield et al., | 1999-04-01 |
| 498 | A Layout for the Optical Readout Scheme based on Straight-Out Manifolds | J. Nelson | 1999-04-30 |
| 496 | Minutes of the MINOS Integration Working Group | Rob Plunkett | 1999-04-12 |
| 495 | Tritium Production in the Dolomitic Rock Adjacent to NuMI Beam Tunnels | A. Wehmann and S. Childress | 1999-05-13 |
| 494 | Concentration Levels of Inflow in NuMI Sump Water | A. Wehmann | 1999-04-15 |
| 493 | Absorber Conceptual Design for 11-98 DOE Baseline Review | A. Wehmann | 1999-04-30 |
| 492 | Seasonal Variations of the Trigger Rate and the Muon Rate in Soudan 2 | W. Barrett et al., | 1999-04-01 |
| 491 | Minutes of the 4PPTF Meeting | Jeff Nelson | 1999-04-08 |
| 490 | Minutes of the April 1999 MINOS Institutional Board meeting at Fermilab | Peter Litchfield | 1999-04-01 |
| 489 | Minutes of the April 1999 Collaboration meeting at Fermilab | Dave Ayres | 1999-04-01 |
| 488 | MINOS DETECTOR STEEL MAGNETIC MEASUREMENTS | Robert Trendler | 1999-04-01 |
| 487 | MINOS TEST TOROID MAGNETIC MEASUREMENTS | Robert Trendler | 1999-04-01 |
| 486 | CC Limits and Measurements | Robert Bernstein | 1999-04-01 |
| 485 | Optical Multiplexing and De-multiplexing: Low energy and low light yield case | Stuart Mufson, Adam Para | 1999-04-01 |
| 484 | MINOS multiplexing Study | Carlos Arroyo | 1999-03-01 |
| 483 | Vacuum oscillation limits based on momentum analysed up-going muons | Jim Musser | 1999-03-01 |
| 482 | Simulation of MINOS CC analysis | Carlos Arroyo | 1999-03-01 |
| 481 | Low delta m^2 sensitivity of the T test | David Petyt | 1999-04-13 |
| 480 | Transparencies from the April MINOS Meeting at Fermilab | M. Goodman | 1999-04-01 |
| 479 | Active Detector (FLS) Simulation in gminos and reco_minos | R. Hatcher | 1999-03-01 |
| 478 | A Comparison of the gminos Simulation to Prototype Module Data | R. Hatcher | 1999-04-01 |
| 477 | Minutes of the April Executive Committee Meetings at Fermilab | Maury Goodman | 1999-04-00 |
| 476 | The MINOS Long-Baseline Neutrino Oscillation Experiment,UK PPESP proposal | P. Adamson et al., | 1999-03-01 |
| 474 | Report of the Committee on phototube selection for MINOS | G. Feldman et al., | 1999-02-01 |
| 473 | Proposal for an R&D effort towards a hybrid emulsion detector | The MINOS collaboration | 1999-03-01 |
| 471 | Two Horns Focusing System for the NuMI Project | V. Garkusha, F. Novoskoltsev, V. Zarucheisky | 1999-02-15 |
| 470 | Position Paper on Steel, Coil, and Detector Plane Prototyping for FY99 | 4PP group | 1999-02-01 |
| 469 | Electronic Working Group Minutes from the February MINOS meeting at CalTech | J. Thron | 1999-02-11 |
| 468 | Minutes of the 2nd February 1999 MINOS Executive committee meeting at CalTech | M. Goodman | 1999-02-01 |
| 467 | Measurement of the light yield...loops grooves and reflectivity | W. Oliver and J. Schneps | 1999-02-12 |
| 466 | Proposal to measure particle production in the Meson area using Main Injector primary and secondary beams | Barnes et al., | 1999-02-01 |
| 465 | Minutes of the February 1999 MINOS Institutional Board meeting in Cal Tech | Peter Litchfield | 1999-02-01 |
| 464 | Minutes of the February 1999 Collaboration meeting in CalTech | Maury Goodman | 1999-02-10 |
| 463 | Transparency copies from the February 1999 MINOS meeting in CalTech | M. Goodman | 1999-02-10 |
| 462 | Minutes of the First February 1999 Executive Committee meeting at CalTech | Maury Goodman | 1999-02-06 |
| 460 | Minutes for Scintillator Issues Sessions of Scintillator Meeting | T. Joffe-Minor | 1999-01-13 |
| 459 | Minutes of the Level 3 Scintillator Strip Meeting | T. Joffe-Minor | 1998-11-20 |
| 456 | The NuMI WBB for nu(tau) Appearance Experiments | V. Garkusha, F. Novoskoltsev | 1998-12-11 |
| 455 | Addendum to the IHEP Task C Report | Gorkusha et al., | 1998-10-01 |
| 454 | Advanced Conceptual Design of the Full Scale Fin Target | Gorkusha et al., | 1998-06-01 |
| 453 | Monitoring NuMI Target | Alexei Kulik | 1999-04-27 |
| 452 | Minutes of the December 1998 MINOS Institutional Board meeting in London | Karol Lang | 1999-01-12 |
| 451 | Minutes of the December 1998 Collaboration meeting at University College London | D. Ayres | 1998-12-01 |
| 450 | Transparencies of the December 1998 MINOS meeting in London | M. Goodman | 1998-12-01 |
| 449 | Minutes of the MINOS executive committee meeting of December 1998 | M. Goodman | 1998-12-12 |
| 448 | Proposed Test of NUMI Prototype Target in Main Injector Beam | K. Anderson | 1998-12-22 |
| 447 | Electronics | Colin Perry | 1998-12-01 |
| 446 | HPD Layouts for the Near Detector | Jeff Nelson and Rob Plunkett | 1998-11-23 |
| 445 | Report of the HPD-PMT Fact-Finding Committee | R.K. Plunkett, B. Baller, M.C. Goodman, V.J. Guarino, J. Kilmer, S. Mufson, and J.K. Nelson | 1998-11-01 |
| 444 | Cable routing schemes for HPD and PMT detectors | J. Nelson | 1998-12-02 |
| 443 | Minutes of the October 1998 Institutional Board meeting at Fermilab | K Lang | 1998-10-01 |
| 439 | Transparencies from the NuMI Baseline Review | M. Goodman | 1998-11-03 |
| 438 | Timing of the NUMI Single Plane Prototype Demonstration Lift | R. Plunkett | 1998-10-27 |
| 436 | Atmospheric Neutrinos in MINOS | D. Petyt & P. Litchfield | 1999-04-01 |
| 435 | Proposed Design Modifications for the MINOS Detector Based on the HPD | P. Border et al., | 1998-11-01 |
| 431 | Minutes of the October 1998 Collaboration meeting at Fermilab | D. Ayres | 1998-10-01 |
| 430 | Transparency copies from the October 1998 MINOS meeting at Fermilab | D. Ayres | 1998-10-01 |
| 428 | MINOS Light Yield: University of Minnesota Test Stand | Nat Longley | 1998-10-17 |
| 427 | Decoding Events with the 8X-Multiplexing MINOS Baseline Detector | S. Mufson and L. Miller | 1998-10-19 |
| 421 | Vacuum Oscillation Limits in MINOS Using upgoing muons | J. Musser | 1998-10-02 |
| 418 | Transparencies from the September 1998 Director's MINOS-NuMI review | M. Goodman | 1998-09-01 |
| 417 | Steel Report | J.K. Nelson | 1998-09-12 |
| 415 | Horn Power Supply Proposal | Ken Bourkland | 1998-09-01 |
| 414 | Detector R&D at CALTECH | B. Choudhary et al., | 1998-12-10 |
| 413 | Thermal Analysis of the MINOS Far Detector Magnet Coil | Zhijing Tang | 1998-09-01 |
| 412 | A High Statistics Search for nue to nutau oscillations | D. Naples et al. | 1998-08-11 |
| 410 | Minutes of the August 1998 MINOS meeting | M. Goodman | 1998-08-01 |
| 409 | Transparencies from the August 1998 MINOS meeting | M. Goodman | 1998-08-01 |
| 408 | Minutes of the August 1998 MINOS Technical Board Meeting | M. Goodman | 1998-08-01 |
| 407 | Minutes of the August 1998 MINOS Executive Committee | M. Goodman | 1998-08-01 |
| 406 | Minutes of the August 1998 MINOS Institutional Board | M. Goodman | 1998-08-01 |
| 404 | Basis of Estimate for the MINOS Far Detector Magnet Coils | Neil Bednar, Zhijing Tang, James Kilmer and Robert Trendler | 1998-09-01 |
| 403 | Insights for NuMI from the Health Physics Society | D. Boehnlein | 1998-08-01 |
| 402 | MINOS Steel Design: Thermal Constraints | R. Milburn | 1998-08-01 |
| 401 | Transparency copies from the July 1998 NuMI-MINOS Director's review | M. Goodman | 1998-07-01 |
| 400 | Workflow for Near Detector Installation | R. Plunkett | 1998-07-01 |
| 399 | MINOS, Response to the Sanders Committee Recommendations. | MINOS | 1998-07-01 |
| 398 | June Monthly Steel Report | J. Kilmer | 1998-07-01 |
| 397 | May 1998 Monthly Steel Report | J. Kilmer | 1998-06-18 |
| 396 | Minutes of the ELY AD HOC STEEL & MAGNET PANEL | R. Milburn | 1998-06-24 |
| 395 | April 1998 Monthly Steel Report | J. Kilmer | 1998-05-01 |
| 394 | Conceptual Design of the Narrow Band Beam Absorber and Low Energy Wide Band Beam Calculations | A. Abramov et al., | 1998-03-01 |
| 393 | Pre-engineering Design for the Technical Components of the NuMI Beams | A. Abramov et al., | 1997-09-01 |
| 392 | Conceptual Design Work and Neutrino Beam Calculations for the NuMI Project | A. Abramov et al., | 1997-06-01 |
| 391 | Preliminary Design Work and Neutrino Beam Calculations for the NuMI Project | A. Abramov et al., | 1997-03-01 |
| 390 | Squashed Field Studies for the Near Detector | J. Thomas | 1998-05-21 |
| 388 | Numu to Nue oscillations in Long-Baseline experiments and the Solar Neutrino Problem | L. Wolfenstein | 1998-05-01 |
| 387 | Minutes of the June 1998 MINOS Institutional Board meeting | D. Ayres | 1998-06-01 |
| 386 | Minutes of the June 1998 MINOS Collaboration meeting | D. Ayres | 1998-06-01 |
| 385 | Minutes of the MINOS executive committee meeting at Ely | M. Goodman | 1998-06-01 |
| 384 | Transparencies from the June 1998 MINOS meeting | D. Ayres | 1998-06-01 |
| 383 | Prototype Horn 1 Failure Analysis | Steven O'Day | 1998-06-09 |
| 382 | Report of the MINOS Detector Review Committee | G. Sanders et al., | 1998-05-01 |
| 381 | Transparencies from the meeting of the PAC subcommittee on NuMI-MINOS | S. Wojcicki | 1998-05-26 |
| 379 | March steel report | J. Kilmer | 1998-05-08 |
| 378 | COMMENTS ON MINOS TOROID STEEL PROPERTIES | Paul Schoessow | 1998-05-01 |
| 377 | Searching for Neutrino Oscillations | Maury Goodman | 1998-05-01 |
| 376 | Estimate of Beam Heating in Horn 1 | Jim Morgan | 1998-05-01 |
| 375 | Neutrino Oscillation Physics at Fermilab: The NuMI-MINOS Project | The MINOS Collaboration | 1998-05-11 |
| 374 | Transparencies from the Directors review of the MINOS Experiment | D. Ayres | 1998-04-01 |
| 372 | Singles rates | J. Cobb | 1998-07-07 |
| 371 | An Estimation of Tritium Production in Helium Bags in the NuMI Target Hall | David Boehnlein | 1998-04-01 |
| 370 | Multipixel Photodetectors | Reinhard Schwienhorst | 1998-04-01 |
| 369 | A Study of Muons Downstream of the Hadron Absorber | A. Wehmann | 1998-05-28 |
| 368 | Dynamic range requirements of the MINOS electronics | J. Cobb | 1998-04-14 |
| 367 | Minutes of the March 1998 MINOS Institutional Board meeting | K. Lang | 1998-03-01 |
| 366 | Minutes of the March 1998 MINOS Collaboration meeting | D. Ayres | 1998-03-01 |
| 365 | Minutes of the March 1998 MINOS executive committee meeting | M. Goodman | 1998-03-01 |
| 364 | Transparencies from the March 1998 MINOS meeting | D. Ayres | 1998-03-01 |
| 363 | MINOS near detector | Jenny Thomas and Stan Wojcicki | 1998-03-01 |
| 361 | The NuMI Project Preliminary Safety Assessment Document | NuMI Project | 1998-12-22 |
| 358 | MINOS Steel Project: January-February monthly report | Jim Kilmer | 1998-03-01 |
| 356 | Studies of Extruded Scintillators for MINOS | Todd Soesbe and Karol Lang | 1998-03-01 |
| 355 | Bolt Strengths | Z. Tang | 1998-03-01 |
| 354 | Preliminary Design Work on NBB Absorber and Target Prototype | A. Abramov et al., | 1998-02-01 |
| 353 | MINOS Steel Plane Buckling Analysis | Zhijing Tang | 1998-02-01 |
| 352 | Minutes of the February 1998 MINOS Institutional Board | K. Lang | 1998-02-01 |
| 351 | Minutes of the February 1998 MINOS Collaboration meeting | D. Ayres | 1998-02-01 |
| 350 | Minutes of the Feb 1998 MINOS executive committee | M. Goodman | 1998-02-13 |
| 348 | Light yield measurements | W. Oliver & J. Schneps | 1998-02-01 |
| 347 | MINOS Toroid Magnetic Measurements | P. Schoessow et al., | 1998-02-03 |
| 343 | Neutrino Event Rate Comparison - Decay Pipe Shielding | J. Hylen | 1998-02-01 |
| 339 | January Report to the SOC | P. D. Barnes, Jr., | 1998-01-01 |
| 338 | Summary of electronics subgroup meeting Dec 1997 | J. Thron | 1997-12-08 |
| 337 | MINOS Technical Design Report | MINOS Collaboration | 1998-10-01 |
| 336 | MINOS Single Plane Prototype Draft Operational Safety Procedure | T. Ladran et al., | 1997-12-01 |
| 335 | Results from an Iron-Proportional Tube Calorimeter Prototype | P. Schoessow et al., | 1997-12-17 |
| 334 | MINOS Single Plane Prototype Preliminary Engineering Safety Note | T. Ladran, et. al. | 1997-12-23 |
| 333 | Summary of the Steel and Installation Meeting at Fermilab | D. Ayres, J. Kilmer, W. Miller, and A.L. Read | 1997-12-08 |
| 332 | Monthly Report to the SOC, December 1997 | P.D. Barnes | 1997-12-01 |
| 331 | Fabrication of Steel Passive Absorber Plates for MINOS Detector | Tony Ladran | 1997-05-19 |
| 330 | Low Carbon Steel Plate for MINOS Detector | Ed Dalder | 1997-05-19 |
| 328 | Transparencies from the December 1997 MINOS meetings | D. Ayres | 1997-12-01 |
| 327 | Minutes of the December 1997 MINOS Technical Board meeting | D. Ayres | 1997-12-01 |
| 326 | Minutes of the December 1997 MINOS Institutional Board meeting | K. Lang | 1997-12-01 |
| 325 | Minutes of the December 1997 MINOS Collaboration meeting | D. Ayres | 1997-12-01 |
| 324 | Minutes of the MINOS executive committee meeting December 6 1997 | M. Goodman | 1997-12-06 |
| 323 | Single Plane Prototype Assembly Procedure | T. Ladran, et al., | 1997-12-01 |
| 322 | Single Plane Prototype Steel Analysis | T. Ladran, et al., | 1997-12-01 |
| 319 | Preliminary MINOS Near Hall Specifications | D. Ayres | 1997-11-01 |
| 318 | Minutes of the MINOS electronics meeting at Rutherford | J. Thron | 1997-11-01 |
| 316 | Transparencies from the MINOS electronics meeting at Rutherford | D. Ayres | 1997-11-01 |
| 315 | MINOS Steel and Magnet R&D November 97 Report | P. D. Barnes, Jr. | 1997-11-01 |
| 314 | MINOS integration issues | R. Milburn | 1997-11-01 |
| 313 | Counting rates in MINOS scintillators | K. Ruddick | 1997-10-01 |
| 310 | MINOS Steel and Magnet R&D October 97 Report | P. D. Barnes,Jr. | 1997-10-01 |
| 308 | Timing Studies for MINOS electronics design | J. Thomas | 1997-10-01 |
| 307 | Scintillator R&D at Cal Tech | Hwi Kim, Yinzi Huang and Doug Michael | 1997-10-17 |
| 306 | Technical Issues Related to Optical Connectors and Mirroring of Fibres | Brajesh Choudhary | 1997-10-15 |
| 305 | Minutes of the September 1997 MINOS executive committee | M. Goodman | 1997-09-01 |
| 304 | Minutes of the September 1997 MINOS Collaboration meeting at Fermilab | D. Ayres | 1997-09-01 |
| 303 | MINOS Steel and Magnet Engineering Long Term Plan | Peter D. Barnes et al., | 1997-10-02 |
| 302 | MINOS Steel and Magnet R&D monthly report to SOC | Peter D. Barnes | 1997-09-02 |
| 301 | The Principles of Muon tracking in MINOS | J. Thomas, A. Para and D. Tovee | 1997-10-02 |
| 300 | MINOS Progress Report to the PAC | D. Ayres and the MINOS collaboration | 1997-10-01 |
| 299 | Preliminary Specifications for MINOS Test Beam facility | R. Talaga | 1997-09-12 |
| 298 | Minutes of the September 1997 MINOS Technical Board meeting | D. Ayres | 1997-09-01 |
| 296 | Transparencies of the September 1997 MINOS meeting | Dave Ayres | 1997-09-01 |
| 295 | Photodetectors for MINOS | Prisca Cushman | 1997-09-11 |
| 294 | The Solid Scintillator Option | Karol Lang, Doug Michael and Adam Para | 1997-09-16 |
| 293 | The MINOS detector instrumented with APT's | Dave Ayres | 1997-09-14 |
| 292 | The MINOS Liquid Scintillator Detector | no author | 1997-09-12 |
| 290 | Identification of Electromagnetic Showers in a Hadronic Shower | Stan Wojcicki | 1997-09-01 |
| 287 | Transparencies from the August 1997 DRAC meeting | D. Ayres | 1997-08-01 |
| 285 | Conceptual Design for the Technical Components of NuMI | J. Hylen et al., | 1997-09-01 |
| 284 | Electron ID and transverse granularity | Adam Para | 1997-07-18 |
| 281 | The Fermilab Long-Baseline Neutrino program | Maury Goodman | 1997-07-01 |
| 280 | Summary of the Photodetector-Electronics Ely subgroup meeting | Prisca Cushman | 1997-06-01 |
| 279 | Groundwater Protection for the NuMI project | S. Childress, J. Hylen, S. Menary, W.M.Smart and A.A. Wehman | 1997-06-01 |
| 278 | Transparencies from the June 1997 MINOS meetings | J.Meier, D. Ayres | 1997-06-01 |
| 277 | Minutes of the June 1997 MINOS Technical Board meeting | D. Ayres | 1997-06-01 |
| 276 | Minutes of the June 1997 MINOS Institutional Board meeting | K. Lang | 1997-06-01 |
| 275 | Minutes of the June 1997 MINOS Collaboration meeting | D. Ayres | 1997-06-01 |
| 274 | Minutes of the MINOS executive committee meeting June 12, 1997 | M. Goodman | 1997-06-12 |
| 272 | The Algebra of the T-test | John Cobb | 1997-06-04 |
| 271 | Theory of the Hylen Hadronic Hose | Rick Milburn | 1997-05-28 |
| 270 | April 1997 MINOS meetings Transparencies | J. Meier, D. Ayres | 1997-04-01 |
| 269 | April 1997 Technical Board Minutes | D. Ayres | 1997-04-01 |
| 268 | April 1997 Institutional Board Minutes | K. Lang | 1997-04-01 |
| 267 | April 1997 MINOS minutes | D. Ayres | 1997-04-01 |
| 266 | April 1997 ExCom Minutes | M. Goodman | 1997-04-27 |
| 265 | MINOS Passive Detector Reference Design Review | D. Wright | 1997-04-01 |
| 262 | BOE for MINOS magnet coils | Johanna Swan, Tony Ladran, Art Harvey | 1997-03-01 |
| 261 | MINOS Safety Document | W. Miller, J. Nelson & J. Thron | 1997-05-01 |
| 260 | Cost Estimates for the Manufacture of MINOS APT's | J. Thron | 1997-03-01 |
| 259 | Report of the MINOS Installation Committee | G. Alner et al., | 1997-03-01 |
| 258 | tau -> pi + X analysis in MINOS | D. Petyt | 1997-03-01 |
| 256 | Basis of Estimate for the Manufacture and Installation of the Reference Liquid Scintillator Detector for MINOS | Jeff Nelson, Tim Berg, M. Hansen and T. Chase | 1997-03-01 |
| 255 | Cost Estimates for the Manufacture of Aluminum Proportional Tubes | Jonathan Thron | 1997-03-01 |
| 254 | (2nd) Report of the Steel Oversight Committee | A.L. Read | 1997-02-17 |
| 253 | Minutes of the MINOS Installation Committee | W. Miller | 1997-01-18 |
| 252 | Structural Design of a High Energy Particle Detector Using Liquid Scintillator | Timothy Berg | 1997-02-01 |
| 251 | Space and Time in Flavor Oscillations - For Pedestrians | Harry Lipkin | 1997-02-01 |
| 250 | Studies of Extruded Plastic Scintillator for MINOS | Karol Lang and Todd Soesby | 1997-02-01 |
| 249 | DRAFT BOE for Plastic Scintillator | K. Lang | 1997-02-20 |
| 248 | Transparencies from the SLAC meeting | C. Arroyo, D. Ayres | 1997-02-14 |
| 247 | Minutes of the MINOS meeting at SLAC, Feb. 14-16 1997 | D. Ayres | 1997-02-14 |
| 246 | Minutes of the Technical Board 2-97 | D.Ayres | 1997-02-14 |
| 245 | Minutes of the Inst. Board 2-97 | D. Ayres | 1997-02-14 |
| 244 | Minutes of the ExCom 2-97 | M. Goodman | 1997-02-14 |
| 243 | Numbering Conventions and Coordinate Systems in gminos | Robert Hatcher | 1997-02-20 |
| 242 | Maximal Lepton Mixing and a Hierarchical Spectrum of Neutrino Mass-Squared Differences | Paul Harrison, Don Perkins and Bill Scott | 1997-01-31 |
| 240 | Detectors for the MINOS long-baseline neutrino oscillation experiment | Dave Ayres | 1996-12-01 |
| 238 | Minutes of the Dec. 1996 Tech. Board meeting | D. Ayres | 1996-12-01 |
| 237 | Minutes of the Dec. 1996 Det. R&D Comm. meeting | D. Ayres | 1996-12-01 |
| 236 | Minutes of the Dec. 1996 MINOS Insti. Board meeting | D. Ayres | 1996-12-01 |
| 235 | Minutes of the Dec. 1996 MINOS ExCom meeting | D. Ayres | 1996-12-01 |
| 234 | Minutes of the December 1996 MINOS meeting at Fermilab | D. Ayres | 1996-12-01 |
| 233 | Transparencies from the December 1996 MINOS meeting | D. Ayres & W. Miller | 1996-12-01 |
| 232 | Cosmic Ray Muon Rates in the MINOS near detector | John Cobb | 1996-12-23 |
| 230 | Report of the Steel Oversight Committee | Lincoln Read | 1996-11-11 |
| 229 | MINOS Physics Goals and Experimental Requirements | Stan Wojcicki | 1996-12-01 |
| 228 | Status Report on Tau Identification in MINOS | The MINOS Collaboration | 1997-01-02 |
| 227 | The MINOS long-baseline experiment at Fermilab | D. Ayres | 1996-10-01 |
| 226 | The Geomagnetic Distortion of the NuMI Neutrino Beam | R.H. Milburn | 1996-11-19 |
| 225 | Minutes of the October MINOS Institutional Board | Bob Webb | 1996-10-01 |
| 224 | The MINOS Experiment | S. Wojcicki | 1996-10-01 |
| 223 | Neutrino Radiations Hazards: A Paper Tiger | J. Donald Cossairt, Nancy L. Grossman and Elaine T. Marshall | 1997-09-01 |
| 222 | Muon Momentum Measurement in Magnetized Iron | Adam Para | 1996-09-01 |
| 221 | NuMI Alignment Requirements | Wesley Smart | 1996-10-01 |
| 220 | Minutes of the October 1996 MINOS meeting | Dave Ayres | 1996-10-01 |
| 219 | Minutes of the October 1996 MINOS Technical Board | Dave Ayres | 1996-10-01 |
| 218 | Transparencies from the October 1996 MINOS meeting | Dave Ayres | 1996-10-01 |
| 217 | Minutes of the MINOS executive committee, October 1996 | Maury Goodman | 1996-10-01 |
| 216 | The MINOS Long-Baseline Neutrino Oscillation Experiment | Jonathan Thron | 1996-01-01 |
| 215 | Electron Identification in MINOS scintillator calorimeter | JC Yun, Jorge Morfin, Adam Para, Alan Wehman | 1996-10-17 |
| 214 | Beam Neutrino PAW files | Jim Hylen | 1996-10-01 |
| 212 | Request for Fermilab Test Beam | The MINOS Gas Calorimetry R&D Group | 1996-10-04 |
| 210 | Underground particle fluxes in the Soudan Mine | Keith Ruddick | 1996-09-01 |
| 209 | Field Computation for a Neutrino Detector Magnet: the Effect of Small Gaps in Large Bodies | Larry Turner | 1996-09-01 |
| 208 | Minutes of COSMOS Emcal Design Meeting at MU | Mikhail Kubantsev | 1996-08-01 |
| 206 | Minutes of the MINOS collaboration meeting August 1996 | Dave Ayres | 1996-08-01 |
| 205 | Minutes of the August 27th Technical Board | Dave Ayres | 1996-08-01 |
| 204 | Transparencies from the August 1996 MINOS meeting | Dave Ayres | 1996-08-01 |
| 202 | Minutes of the August 1996 MINOS Institutional Board | Dave Ayres | 1996-08-23 |
| 200 | Basis of Estimate for Far Detector Steel | Doug Wright | 1997-08-14 |
| 199 | Effect of local magnetic field variations | Ed Hartouni | 1996-09-07 |
| 198 | A proposal for a Laminated Pie Mechanical Construction of a Toroidal Magnet for the Far Detector for the MINOS Experiment | Norm Hill | 1996-08-20 |
| 197 | Properties of some systems for the NuMI Neutrino Beams | V. Garkusha et al., | 1996-07-01 |
| 196 | Proposal for triggerless MINOS readout | Al Gara | 1996-07-22 |
| 195 | The MINOS Detector Steel Planes: Plates or Foils? | Rick Milburn | 1996-07-18 |
| 194 | Can Switched Capacitor Arrays be used in the COSMOS ECAL? | Robert Ball | 1996-07-18 |
| 193 | Lutsen MINOS Institutional Board Minutes | Jorge Morfin | 1996-06-01 |
| 192 | Lutsen MINOS Collaboration Meeting Minutes | Dave Ayres | 1996-06-05 |
| 191 | Lutsen MINOS Technical Board Minutes | Dave Ayres | 1996-06-08 |
| 190 | June 1996 MINOS R&D committee minutes | Dave Ayres | 1996-06-07 |
| 188 | The NuMI Neutrino Beam and Geomagnetism | R. H. Milburn | 1996-06-26 |
| 187 | Lutsen MINOS meeting transparencies | Dave Ayres | 1996-06-05 |
| 186 | June 1996 MINOS executive committee minutes (1) | Maury Goodman | 1996-06-05 |
| 185 | ABS Plastic RPC's | Doug Wright et al., | 1995-10-11 |
| 184 | MINOS Experiment R&D Plan: FY 1996-1998 | Dave Ayres | 1996-05-01 |
| 183 | Prospects in Neutrino Physics | Stan Wojcicki | 1996-05-01 |
| 181 | Far Detector Steel Flatness and Gap Tolerances | Tony Ladran and Doug Wright | 1996-11-13 |
| 180 | Minutes of the April 1996 MINOS meeting | Dave Ayres | 1996-04-15 |
| 179 | Minutes of the April 1996 MINOS Technical Board meeting | Dave Ayres | 1996-04-15 |
| 178 | Minutes of the April 1996 MINOS Detector R&D Committee meeting | Dave Ayres | 1996-04-15 |
| 177 | Transparencies of the April 1996 MINOS meeting | Dave Ayres | 1996-04-15 |
| 176 | Minutes of the April 1996 MINOS executive committee | Maury Goodman | 1996-04-14 |
| 172 | Preliminary Neural Net Results for the Gas EMCAL | Byron Roe | 1996-02-02 |
| 171 | Some plots indicating Gas EMCAL Discrimination Beyond that Presently Obtained | Byron Roe | 1996-01-19 |
| 170 | COSMOS Electromagnetic Calorimeter Lead Glass Option | Asratyan et al., | 1996-02-05 |
| 169 | COSMOS Event Reconstruction using the Liquid-Scintillator EMCAL | Jeff Nelson | 1996-02-07 |
| 167 | MINOS organization chart | Dave Ayres | 1996-10-23 |
| 166 | Minutes of the 2-96 MINOS executive committee meeting | Maury Goodman | 1996-02-01 |
| 165 | Transparencies of Feb 1996 MINOS collaboration meeting | D. Ayres | 1996-02-01 |
| 164 | Minutes of the 2-96 MINOS Institutional Board | Jorge Morfin | 1996-02-01 |
| 163 | Minutes of the 2-96 MINOS Det. R&D Comm. meeting | Dave Ayres | 1996-02-01 |
| 162 | Minutes of the 2-96 MINOS Technical Board meeting | Dave Ayres | 1996-02-01 |
| 161 | Minutes of the 2-96 MINOS collaboration meeting | Dave Ayres | 1996-02-01 |
| 158 | NuMI Civil Construction; Excavation of the Experimental Halls | Tim. E. Toohig | 1996-01-12 |
| 154 | Wide Band Beam Position Paper | Anthony Malensek and Dan Crane | 1996-01-29 |
| 153 | Minutes and Summary of a MINOS Electronics Meeting 11-Dec-1995 | Jonathan Thron | 1996-01-11 |
| 152 | Main Injector Position on 120 or 150 GeV Operation of NuMI | Dave Johnson, Dixon Bogert, Phil Martin, Steve Holmes | 1995-11-27 |
| 151 | E803 | Cosmos 1996-97 Funding Request - COSMOS Collaboration | 1996-01-07 |
| 150 | Civil Construction Position Paper II | Tim Toohig | 1995-12-26 |
| 149 | Heterogenous Detector Revisited | S. Wojcicki | 1996-01-03 |
| 148 | COSMOS Electromagnetic Calorimeter Lead Glass Option | M. Kubantsev et al., | 1995-12-01 |
| 147 | Civil Construction Position Paper I | Tim Toohig | 1995-11-26 |
| 146 | Neutrino Beams Using the Main Injector | Anthony Malensek | 1995-11-30 |
| 145 | Answers to the Committee's Questions on Hardware Issues | J.K. Nelson, and R.W. Rusack | 1995-12-05 |
| 143 | Design and Construction of the COSMOS Gas Proportional Electromagnetic Calorimeter | University of Michigan COSMOS Group | 1995-11-08 |
| 142 | Summary of BNL Test Beam Data for a Projective Gas EM Calorimeter | D. Levin | 1995-10-26 |
| 141 | Simulations and Event Reconstruction for a Projective Gas Calorimet | D. Levin | 1995-10-01 |
| 140 | Monte-Carlo Comparisons of Various COSMOS EM Calorimeters | B.P. Roe and R.C. Ball | 1995-08-17 |
| 139 | Minutes of the MINOS Institutional Board, | Jack Schneps | 1995-12-09 |
| 138 | Minutes of the MINOS Det. R&D Comm. meeting | Dave Ayres | 1995-12-08 |
| 137 | Minutes of the MINOS Technical Board meeting | Dave Ayres | 1995-12-10 |
| 136 | Minutes of the MINOS collaboration meeting | Dave Ayres | 1995-12-10 |
| 135 | Minutes of the MINOS executive committee meeting | Maury Goodman | 1995-12-08 |
| 134 | Some Simulation Results Relevant to E803 EmCal Design | Noel Stanton | 1995-07-19 |
| 133 | Transparencies of December 1995 MINOS collaboration meeting. | M. Schub and D. Ayres | 1995-12-09 |
| 132 | Position Paper on the Length of the NuMI shield | D. Crane et al., | 1995-12-07 |
| 131 | The Design of the COSMOS Liquid-Scintillator EM Calorimeter Option | J. dela Cova, J.K. Nelson, and R. Rusack | 1996-03-04 |
| 130 | MINOS Detector R&D Plan | D. Ayres et al., | 1995-12-01 |
| 128 | Could Bent Crystals be used to Construct Long-Baseline Neutrino Beams? | D. Carrigan | 1996-05-01 |
| 127 | UK Simulation Meeting Minutes 8-November-1995 | Peter Litchfield | 1995-11-08 |
| 126 | Inflow of groundwater to the NuMI tunnel | T. Toohig | 1995-11-25 |
| 125 | EGRESS PROVISIONS | Tim Toohig | 1995-11-22 |
| 122 | E803 response to the suggestion of short spill running | R. Sidwell | 1995-10-27 |
| 121 | The Length of the NuMI Shield | D. Crane et al., | 1995-11-21 |
| 120 | Minutes of the MINOS October 1995 Technical Board Meeting | Dave Ayres | 1995-10-01 |
| 119 | Minutes of the MINOS collaboration meeting, October 1995 | Dave Ayres | 1995-10-01 |
| 118 | Transparencies from the October 1995 MINOS collaboration meeting | D. Ayres | 1995-10-01 |
| 117 | A Method for the detection of Neutrino Oscillations in a Long-Baseline Experiment using energy measurements of numu charged current events | John Cobb | 1995-10-01 |
| 116 | Minutes of the MINOS executive committee meeting | Maury Goodman | 1995-10-01 |
| 115 | Minutes of the MINOS institutional board meeting | Jack Schneps | 1995-10-01 |
| 114 | Charge Properties in Glass-electrode Resistive Plate Chamber | Doug Michael and David Relyea | 1995-10-05 |
| 113 | K-long production angle in the NuMI beam | Dan Crane | 1996-05-21 |
| 112 | Neutrino Cross Sections | Hugh Gallagher and Maury Goodman | 1995-11-01 |
| 109 | Neutrino Beam Simulation using PAW with Weighted Monte Carlo | Rick Milburn | 1995-10-01 |
| 107 | Minutes of Software meeting | Peter Litchfield | 1995-06-26 |
| 106 | A test for Neutrino Oscillations Using the Energy Distributions of Numu Charged Current Events | John Cobb | 1995-08-02 |
| 105 | MINOS Minutes July 10-11, 1995 | Dave Ayres | 1995-07-10 |
| 102 | The CC Energy Signature in a Full Monte Carlo Simulation | H.J. Trost | 1995-07-10 |
| 101 | Event type identification and systematic errors for numu to nue oscillations | D Michael and L. Miller | 1995-07-07 |
| 100 | Answers to More HEPAP Questions | D. Ayres et al., | 1995-07-14 |
| 99 | Report on the BNL test of the prototype COSMOS liquid scintillator calorimeter | J. dela Cova et al., | 1995-08-08 |
| 98 | Simulations of the prototype liquid scintillator calorimeter | J.K. Nelson & Roger Rusack | 1995-07-01 |
| 97 | The Effect of Rows of Spacers on the CC Energy Analysis | H.J. Trost | 1995-06-20 |
| 96 | MINOS Answers to HEPAP Questions | D. Ayres | 1995-06-09 |
| 95 | Limit on nu_mu to nu_tau osc. from CCFR | Kevin McFarland, Donna Naples et al. | 1995-06-16 |
| 94 | Update to E803 Proposal | R. Sidwell et al., | 1995-06-07 |
| 92 | Status Report NuMI TDR | J. Morfin et al., | 1995-06-21 |
| 91 | MINOS Institutional Board Minutes of May 21, 1995 | J. Schneps | 1995-05-21 |
| 89 | Minutes of the MINOS Collaboration | Dave Ayres | 1995-05-20 |
| 88 | Errors on dmsq and mxang from CC Energy Measurements | J. Cobb | 1995-05-17 |
| 87 | Trip Reports of the NuMI beam group to CERN | Dan Crane, Anthony Malensek and Gordon Koizumi | 1995-03-01 |
| 86 | MINOS Executive committee minutes 4-9-95 | Maury Goodman | 1995-04-09 |
| 85 | E803 Cost Estimates | Ron Sidwell | 1995-04-17 |
| 84 | Electronics Discussions at Oxford | J. Thron | 1995-03-31 |
| 83 | Plastic-Scintillator Calorimeters | R. Thun | 1995-03-06 |
| 81 | Institutional Board Meeting Minutes | Jack Schneps | 1995-04-08 |
| 79 | Addendum to P-875:A Long Baseline Neutrino Oscillation Experiment at Fermilab | MINOS Collaboration | 1995-04-21 |
| 78 | Study of far detector aspect ratios | Doug Michael | 1994-11-01 |
| 77 | Minutes of the MINOS meeting April 8-9, 1995 | Dave Ayres | 1995-04-08 |
| 76 | Minutes of the COSMOS meeting of April 1-2 | Bill Reay | 1994-04-01 |
| 75 | Limit test calculations for R(near-far), R(nc-cc) and R(mu-nu) | Kevin Langenbach | 1995-04-08 |
| 72 | The Fermilab NuMI Project and Neutrino Oscillation Program | G. Rameika | 1995-04-01 |
| 71 | Summary of the MINOS proposal | Dave Ayres | 1995-03-01 |
| 70 | A Long Baseline Neutrino Oscillation Experiment at Fermilab | Peter Litchfield | 1995-03-01 |
| 69 | E803 Cost Estimates | Noel Stanton | 1995-02-14 |
| 66 | Hadron and Muon Energy Measurement in the Far Detector | David Petyt | 1995-02-10 |
| 65 | Extraction | DAVE JOHNSON | 1995-11-27 |
| 64 | Near-Far Similarities and Differences in the NuMI beam | D. Crane and M. Goodman | 1995-04-26 |
| 63 | MINOS Proposal | Dave Ayres et al., | 1995-02-09 |
| 62 | E-875 Survey and Alignment, Status and Costs | Terry Sager | 1995-01-24 |
| 60 | Determining delta m^2 in E803, the movable beam stop | Jack Schneps | 1995-01-16 |
| 59 | Unofficial notes of the Jan 1995 Long Baseline Collaboration Meeting | Dave Ayres | 1995-01-01 |
| 58 | Minutes of the Long Baseline Collaboration Institutional Board | Jack Schneps | 1995-01-12 |
| 57 | Report of the Long Baseline Experiment naming commitee | Maury Goodman and Doug Michael | 1995-01-10 |
| 54 | REPORT OF THE LBNE DETECTOR R&D COMMITTEE | D. Ayres, K. Heller (chair), D. Michael | 1995-01-04 |
| 53 | Minutes of SBl-LBl Beam Design Meeting of 3 January 1995 | J. Morfin | 1995-01-03 |
| 49 | Standard Assumptions for the January proposal | Maury Goodman | 1995-12-15 |
| 48 | Unofficial notes of the December Long Baseline Collaboration Meeting | Dave Ayres | 1994-12-02 |
| 47 | Minutes of the Long Baseline Collaboration Institutional Board | Jack Schneps | 1994-12-03 |
| 46 | The detector shape | Doug Michael | 1994-11-19 |
| 44 | Long-Baseline Neutrino Oscillation Experiments | Dan Crane and Maury Goodman | 1994-11-15 |
| 40 | Beam Issues from a Short-Baseline Perspective | Noel Stanton | 1994-10-28 |
| 35 | Studies of Decay pipe radius and length | Dan Crane | 1994-11-22 |
| 33 | Status report to the Fermilab PAC for the Long Baseline Neutrino Experiment | Stan Wojcicki | 1994-10-13 |
| 32 | Unofficial notes on the Long Baseline Collaboration meeting at Fermilab, October 1-2, 1994 | D. Ayres | 1994-10-01 |
| 31 | Minutes of the Beam Design meeting: 7 October 1994 | Jorge Morfin | 1994-10-07 |
| 27 | Long Baseline Neutrino Beam Calculations | Bob Blair, Maury Goodman, PK Job | 1994-09-30 |
| 25 | E803 Sensitivity to Antineutrino Contamination in the Beam | Noel Stanton | 1994-09-23 |
| 19 | Comparison of Long Baseline Neutrino Beam Calculations | Doug Michael | 1994-08-20 |
| 17 | Unofficial notes on the Long Baseline Collaboration meeting at Fermilab | D. Ayres | 1994-08-30 |
| 13 | Some comments on neutrino beam design | T.E. Toohig | 1994-08-03 |
| 12 | List of transparencies from the long baseline neutrino and atmospheric neutrino sessions at Snowmass | Maury Goodman | 1995-11-01 |
| 10 | Expression of interest for a long baseline neutrino oscillation experiment using a CERN beam and a large magnetic sampling calorimeter at Gran Sasso | G.J. Alner et al. | 1994-06-16 |
| 8 | Expression of interest for a long-baseline neutrino oscillation experiment from Fermilab to Soudan using a 16 kT iron calorimeter | W.W.M. Allison et al. | 1994-05-16 |
| 6 | P822 response to the PAC's questions of 11th April 1994 | P.J.Litchfield | 1994-05-16 |
| 4 | Update to P822: Proposal for a long-baseline neutrino oscillation experiment from Fermilab to Soudan | P. Litchfield | 1994-03-08 |